[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":593},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,12,50,2641,[13,34,46,58,70,82,94,104,116,125,137,149,161,173,185,196,206,218,230,242,253,265,277,289,300,312,323,335,347,359,369,381,391,403,415,427,435,447,459,471,483,495,507,519,527,539,547,559,571,582],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1107760,1,"单选题","根据现行规定，某分部分项工程的清单工程量为20000m3，施工方案工程量为30000m3。若该分部分项工程人材机费为100万元，企业管理费为6万元，利润为8万元，措施项目费为7万元，规费为5万元，税金为6万元，则该分部分项工程投标报价的综合单价为（ ）元\u002Fm3。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","38",false,{"key":24,"text":25,"correct":22},"B","44",{"key":27,"text":28,"correct":29},"C","57",true,{"key":31,"text":32,"correct":22},"D","66","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1107761,"审核投标报价时，发现某标书漏填了分部分项工程量清单中“地面找平”一项的综合单价和合价，则正确处理方式是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"视为该项费用已包含在工程量清单的其他单价和合价中",{"key":24,"text":41,"correct":22},"认定该标书为废标",{"key":27,"text":43,"correct":22},"要求投标人就此项进行单独报价，补充到原报价书中",{"key":31,"text":45,"correct":22},"由工程师认定一个合理价格补充到原报价书中",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1107762,"根据《计价规范》，关于招标控制价的描述中，正确的有（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"招标控制价由分部分项工程费、措施项目费、其他项目费、规费和税金组成，不应包括招标文件中要求投标人承担的风险费用",{"key":24,"text":53,"correct":22},"国有资金投资项目的招标人可在招标文件中编制招标控制价或标底",{"key":27,"text":55,"correct":22},"招标控制价应在招标时公布，可以上调或下浮",{"key":31,"text":57,"correct":29},"招标人应招标控制价报工程所在地工程造价管理机构备查",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1107763,"招标人要求总承包人对专业工程进行统一管理和协调的，总承包人可计取总承包服务费，其取费基数为（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"专业工程估算造价",{"key":24,"text":65,"correct":22},"投标报价总额",{"key":27,"text":67,"correct":22},"分部分项工程费用",{"key":31,"text":69,"correct":22},"分部分项工程费与措施费之和",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1107764,"发包方只给出发包工程的有关分部分项工程以及工程范围，承包方填报相应的价格，最后按实际完成的工程数量进行结算，这属于（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"可调单价合同",{"key":24,"text":77,"correct":22},"估算工程量单价合同",{"key":27,"text":79,"correct":29},"纯单价合同",{"key":31,"text":81,"correct":22},"固定价合同",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1107765,"作为估算工程量单价合同，结算工程最终价款的依据是合同中规定的分部分项工程单价和（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"工程量清单中提供的工程量",{"key":24,"text":89,"correct":22},"施工图中的图示工程量",{"key":27,"text":91,"correct":22},"合同双方商定的工程量",{"key":31,"text":93,"correct":29},"承包人实际完成的工程量",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1107766,"当实际完成工程量与清单工程量没有实质性差异时，由承包方承担工程量变动风险的合同是（ ）。",[98,99,101,102],{"key":20,"text":77,"correct":22},{"key":24,"text":100,"correct":29},"固定总价合同",{"key":27,"text":79,"correct":22},{"key":31,"text":103,"correct":22},"成本加酬金合同",{"id":105,"libraryId":5,"type":15,"typeLabel":16,"stem":106,"options":107,"answer":24,"analysis":33},1107767,"根据《清单计价规范》，对于投标报价审核时，投标企业可以根据拟建工程的具体施工方案进行列项的清单是（ ）。",[108,110,112,114],{"key":20,"text":109,"correct":22},"分部分项工程量清单",{"key":24,"text":111,"correct":29},"措施项目清单",{"key":27,"text":113,"correct":22},"其他项目清单",{"key":31,"text":115,"correct":22},"规费项目清单",{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":20,"analysis":33},1107768,"根据《计价规范》，对招标文件提供的清单，投标人必须逐一计价且对所列内容不允许有任何更改变动的是（ ）。",[120,121,122,123],{"key":20,"text":109,"correct":29},{"key":24,"text":111,"correct":22},{"key":27,"text":113,"correct":22},{"key":31,"text":124,"correct":22},"零星工作项目表",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":20,"analysis":33},1107769,"在编制招标控制价时，对于招标人自行供应材料的，总承包服务费一般可按招标人供应材料价值的（ ）考虑。",[129,131,133,135],{"key":20,"text":130,"correct":29},"1%",{"key":24,"text":132,"correct":22},"1.5%",{"key":27,"text":134,"correct":22},"3%～5%",{"key":31,"text":136,"correct":22},"10%～15%",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":24,"analysis":33},1107770,"根据计量规范规定，不宜计量的措施项目费的通用计算方法是（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"∑（措施项目工程量×措施项目综合单价）",{"key":24,"text":144,"correct":29},"∑（计算基数×相应费率）",{"key":27,"text":146,"correct":22},"∑（措施项目工程量×措施项目综合单价）+∑（单项措施费）",{"key":31,"text":148,"correct":22},"∑（措施项目项数×综合单价）",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":24,"analysis":33},1107771,"根据《建设工程量清单计价规范》（GB 50500-2013），下列关于工程量清单项目编码的说法中，正确的是（ ）。",[153,155,157,159],{"key":20,"text":154,"correct":22},"第三级编码为分部工程顺序码，由三位数字表示",{"key":24,"text":156,"correct":29},"第五级编码应根据拟建工程的工程量清单项目名称设置，不得重码",{"key":27,"text":158,"correct":22},"同一标段含有多个单位工程，不同单位工程中项目特征相同的工程应采用相同编码",{"key":31,"text":160,"correct":22},"补充项目编码以“B”加上计算规范代码后跟三位数字表示，并应从001起顺序编制",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},1107772,"根据《建设工程工程量清单计价规范》GB50500-2013，某分部分项工程的项目编码为01-02-03-004-005，其中“004”这一级编码的含义是（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":22},"附录分类顺序码",{"key":24,"text":168,"correct":22},"清单项目顺序码",{"key":27,"text":170,"correct":22},"分部工程顺序码",{"key":31,"text":172,"correct":29},"分项工程顺序码",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":20,"analysis":33},1107773,"采用工程量清单招标时，由工程造价咨询人提供了招标工程量清单，对其完整性和准确性负责的单位是（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":29},"发布招标文件的招标人",{"key":24,"text":180,"correct":22},"发放招标文件的招标代理人",{"key":27,"text":182,"correct":22},"编制清单的工程造价咨询人",{"key":31,"text":184,"correct":22},"招标人的上级管理单位",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":31,"analysis":33},1107774,"投标文件中已标明价格，经算数性错误修正（如有），且承包人已确认的工程量清单，称为（ ）。",[189,190,192,194],{"key":20,"text":109,"correct":22},{"key":24,"text":191,"correct":22},"招标工程量清单",{"key":27,"text":193,"correct":22},"工程量清单计价表",{"key":31,"text":195,"correct":29},"已标价工程量清单",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":20,"analysis":33},1107775,"下列招标文件所列的工程量清单中，不可调整的闭口清单是（ ）。",[200,201,203,205],{"key":20,"text":109,"correct":29},{"key":24,"text":202,"correct":22},"能计量的措施项目清单",{"key":27,"text":204,"correct":22},"不能计量的措施项目清单",{"key":31,"text":113,"correct":22},{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":31,"analysis":33},1107776,"某工程量清单编制中，项目编码为010101004002，其所反映的分项工程代码及其内涵是（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"002；土石方工程",{"key":24,"text":213,"correct":22},"002；土方工程",{"key":27,"text":215,"correct":22},"004；挖一般土方",{"key":31,"text":217,"correct":29},"004；挖基坑土方",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":24,"analysis":33},1107777,"根据《建设工程工程量清单计价规范》GB 50500－2013的规定，下列选项中属于工程量清单编制依据的是（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"施工图预算",{"key":24,"text":225,"correct":29},"建设工程设计文件",{"key":27,"text":227,"correct":22},"拟定的投标文件",{"key":31,"text":229,"correct":22},"非常规施工方案",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":20,"analysis":33},1107778,"根据《建设工程工程量清单计价规范》GB 50500－2013的规定，分部分项工程量清单中的工程数量是按照（ ）计算的。",[234,236,238,240],{"key":20,"text":235,"correct":29},"实体工程量的净值",{"key":24,"text":237,"correct":22},"设计文件结合不同施工方案确定的工程量平均值",{"key":27,"text":239,"correct":22},"工程实体量和损耗量之和",{"key":31,"text":241,"correct":22},"实际施工完成的全部工程量",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":20,"analysis":33},1107779,"工程量清单的十二位项目编码中，一至二位表示（ ）。",[246,248,250,251],{"key":20,"text":247,"correct":29},"专业工程码",{"key":24,"text":249,"correct":22},"分类顺序吗",{"key":27,"text":170,"correct":22},{"key":31,"text":252,"correct":22},"清单项目名称顺序码",{"id":254,"libraryId":5,"type":15,"typeLabel":16,"stem":255,"options":256,"answer":27,"analysis":33},1107780,"根据《建设工程工程量清单计价规范》GB 50500－2013的规定，下列关于工程量清单的说法正确的是（ ）。",[257,259,261,263],{"key":20,"text":258,"correct":22},"分部分项工程项目清单为可调整的闭口清单",{"key":24,"text":260,"correct":22},"暂估价只包括材料暂估价和工程设备暂估价",{"key":27,"text":262,"correct":29},"暂列金额是招标人暂定并包括在合同中的一笔款项",{"key":31,"text":264,"correct":22},"措施项目清单为不可调整清单",{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":24,"analysis":33},1107781,"下列关于工程量清单的适用范围，说法正确的是（ ）。",[269,271,273,275],{"key":20,"text":270,"correct":22},"工程量清单适用于招标控制价的编制.投标报价的编制.工程合同价款的约定等活动，但不包括工程造价鉴定",{"key":24,"text":272,"correct":29},"使用国有资金投资的工程建设工程发承包项目，必须采用工程量清单计价",{"key":27,"text":274,"correct":22},"对于非国有资金投资的工程建设项目，是否采用工程量清单方式计价由国家确定",{"key":31,"text":276,"correct":22},"对于不采用工程量清单计价的建设工程，仍应执行现行计价规范规定的工程价款调整.工程计量和价款支付.索赔与现场签证等条文。",{"id":278,"libraryId":5,"type":15,"typeLabel":16,"stem":279,"options":280,"answer":20,"analysis":33},1107782,"下列成本加酬金合同计价形式中，最难以控制成本的是（ ）。",[281,283,285,287],{"key":20,"text":282,"correct":29},"成本加固定百分比酬金合同",{"key":24,"text":284,"correct":22},"成本加固定金额酬金合同",{"key":27,"text":286,"correct":22},"成本加奖罚合同",{"key":31,"text":288,"correct":22},"最高限额成本加固定最大酬金",{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":31,"analysis":33},1107783,"（ ）的合同计价方式，承包方的实际成本实报实销，这不利于鼓励承包方降低成本，使得这种合同计价方式很少被采用。",[293,295,297,298],{"key":20,"text":294,"correct":22},"成本加奖罚",{"key":24,"text":296,"correct":22},"成本加固定酬金",{"key":27,"text":288,"correct":22},{"key":31,"text":299,"correct":29},"成本加固定百分比酬金",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":24,"analysis":33},1107784,"根据成本加酬金合同中的成本加奖罚合同的规定，当（ ）情况下，承包人才可获得实际发生的工程成本，获得酬金和奖金。",[304,306,308,310],{"key":20,"text":305,"correct":22},"实际成本＝预期成本",{"key":24,"text":307,"correct":29},"实际成本＜预期成本",{"key":27,"text":309,"correct":22},"实际成本＞预期成本",{"key":31,"text":311,"correct":22},"实际成本＜限额成本",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":27,"analysis":33},1107785,"根据《计价规范》的规定，对于合同工期较短、建设规模较小，技术难度较低，且施工图设计已审查完备的建设工程可以采用（ ）。",[316,318,319,321],{"key":20,"text":317,"correct":22},"单价合同",{"key":24,"text":75,"correct":22},{"key":27,"text":320,"correct":29},"总价合同",{"key":31,"text":322,"correct":22},"成本价酬金合同",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},1107786,"某公建工程的施工图设计已经完成，且计划工期为24个月，其应采用（ ）合同。",[327,329,331,333],{"key":20,"text":328,"correct":22},"固定总价",{"key":24,"text":330,"correct":29},"可调总价",{"key":27,"text":332,"correct":22},"估计工程量单价",{"key":31,"text":334,"correct":22},"可调单价",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":20,"analysis":33},1107787,"估算工程量单价合同，在最终工程结算时，工程量是以（ ）为计算依据。",[339,341,343,345],{"key":20,"text":340,"correct":29},"实际完成的工程量",{"key":24,"text":342,"correct":22},"招标人提供的清单工程量",{"key":27,"text":344,"correct":22},"施工图工程量",{"key":31,"text":346,"correct":22},"估算出的工程量",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":27,"analysis":33},1107788,"采用估算工程量单价合同时，最后的工程结算总价是按（ ）计算确定的。",[351,353,355,357],{"key":20,"text":352,"correct":22},"发包人提供的估计工程量及承包人所填报的单价",{"key":24,"text":354,"correct":22},"发包人提供的估计工程量及承包人实际发生的单价",{"key":27,"text":356,"correct":29},"实际完成的工程量及承包人所填报的单价",{"key":31,"text":358,"correct":22},"实际完成的工程量及承包人实际发生的单价",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},1107789,"某高档住宅小区工程，预计工期为10个月，发包时已完成施工图设计，发承包方应采用（ ）合同形式较为合适。",[363,364,365,367],{"key":20,"text":328,"correct":29},{"key":24,"text":330,"correct":22},{"key":27,"text":366,"correct":22},"成本加酬金",{"key":31,"text":368,"correct":22},"估算工程量单价",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},1107790,"下列情况下，适用于固定总价合同的是（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":29},"工程范围清楚明确",{"key":24,"text":376,"correct":22},"工程量大，工期短",{"key":27,"text":378,"correct":22},"工程结构复杂，风险大",{"key":31,"text":380,"correct":22},"合同条件不完备",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":20,"analysis":33},1107791,"对于工程内容和技术经济指标规定很明确的项目，合同中列有调值条款，且工期在1年以上的适用（ ）。",[385,387,388,389],{"key":20,"text":386,"correct":29},"可调总价合同",{"key":24,"text":100,"correct":22},{"key":27,"text":103,"correct":22},{"key":31,"text":390,"correct":22},"固定单价合同",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1107792,"下列有关总价合同的说法正确的是（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":22},"总价合同下，业主为了方便承包商投标，可以在招标文件中给出工程量表，并对工程量表中的数量承担责任",{"key":24,"text":398,"correct":29},"总价合同下，业主可以不提供工程量清单，由承包人自编工程量清单并报价",{"key":27,"text":400,"correct":22},"总价合同下，业主提供的工程量表的分项往往具有固定性",{"key":31,"text":402,"correct":22},"总价合同下，合同总价款为“包干”式，但是每一分项工程的价款并不固定",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":24,"analysis":33},1107793,"根据现行规定，除钢材、水泥等，其它材料价格涨幅超过投标报价时基准价格（ ）以上，由发包人承担其涨价风险。",[407,409,411,413],{"key":20,"text":408,"correct":22},"3%",{"key":24,"text":410,"correct":29},"5%",{"key":27,"text":412,"correct":22},"10%",{"key":31,"text":414,"correct":22},"15%",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":31,"analysis":33},1107794,"根据《建设工程工程量清单计价规范》（GB 50500-2013）的规定，下列有关投标报价的审核内容说法正确的是（ ）。",[419,421,423,425],{"key":20,"text":420,"correct":22},"暂列金额应按照招标工程量清单中列出的金额填写，但是有必要时可以变动",{"key":24,"text":422,"correct":22},"专业工程暂估价由投标人自主报价",{"key":27,"text":424,"correct":22},"在施工中，出现风险内容及其范围在招标文件规定的范围内时，合同价款可以调整",{"key":31,"text":426,"correct":29},"措施项目费中的安全文明施工费不作为竞争性费用",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":27,"analysis":33},1107795,"根据现行规定，某分部分项工程的清单工程量为20000m3，施工方案工程量为30000m3。若该分部分项工程费中人材机费为100万元，措施项目费为7万元，规费为5万元，企业管理费为6万元，利润为8万元，税金为6万元，则该分部分项工程投标报价的综合单价为（ ）元\u002Fm3。",[431,432,433,434],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":32,"correct":22},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":24,"analysis":33},1107796,"关于工程量清单招标方式下，投标人报价的说法，正确的是（ ）。",[439,441,443,445],{"key":20,"text":440,"correct":22},"专业工程暂估价中的专业工程应由投标人自主确定价格并计入报价",{"key":24,"text":442,"correct":29},"暂估价中的材料应按暂估单价计入综合单价",{"key":27,"text":444,"correct":22},"措施项目中的总价项目应包括规费和税金",{"key":31,"text":446,"correct":22},"投标人报价时可以给予一定幅度的总价优惠",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},1107797,"根据《建设工程工程量清单计价规范》（GB 50500-2013）的规定，下列关于其他项目费的审核说法正确的是（ ）。",[451,453,455,457],{"key":20,"text":452,"correct":29},"暂估价不得变动和更改",{"key":24,"text":454,"correct":22},"暂列金额应按照招标工程量清单中列出的金额填写，必要时可以变动",{"key":27,"text":456,"correct":22},"计日工应按照施工图中的图示工程量，自主确定综合单价并计算计日工金额",{"key":31,"text":458,"correct":22},"总承包服务费应按照投标人提出协调.配合与服务要求和施工现场管理需要自主确定",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":20,"analysis":33},1107798,"根据《建设工程工程量清单计价规范》GB 50500－2013的规定，国有资金投资项目，必须由（ ）编制招标控制价。",[463,465,467,469],{"key":20,"text":464,"correct":29},"具有编制能力的招标人",{"key":24,"text":466,"correct":22},"具有相应资质的工程造价咨询人",{"key":27,"text":468,"correct":22},"具有招标代理资质的中介机构",{"key":31,"text":470,"correct":22},"项目管理公司合同管理机构",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":24,"analysis":33},1107799,"根据《建设工程工程量清单计价规范》（GB 50500-2013）的规定，关于编制招标控制价的说法正确的是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":22},"国有资金投资的建设工程招标，招标人可以不编制招标控制价",{"key":24,"text":478,"correct":29},"暂估价中专业工程金额应按招标工程量清单中列出的金额填写",{"key":27,"text":480,"correct":22},"暂估价如招标工程量清单未列出金额或单价时，编制招标控制价时可以不予考虑",{"key":31,"text":482,"correct":22},"总承包服务费应由招投标双方协商确定",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":24,"analysis":33},1107800,"下列有关单价合同的表述，正确的是（ ）。",[487,489,491,493],{"key":20,"text":488,"correct":22},"单价合同执行的单价是估计单价，而非准确单价，单价在合同实施过程中允许有上下的浮动变化",{"key":24,"text":490,"correct":29},"单价合同的实际工程价格可能与原合同价格不相吻合",{"key":27,"text":492,"correct":22},"采用纯单价合同时，发包方只向承包方给出发包工程的有关分部分项工程以及工程范围，并对工程量作出规定",{"key":31,"text":494,"correct":22},"根据《建设工程工程量清单计价规范》GB50500－2013的规定，当工程量偏差超过10%以上时，可以调整综合单价",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":31,"analysis":33},1107801,"关于固定总价合同特点的说法，正确的是（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":22},"合同执行过程中，由于市场因素造成工料成本增加，合同总价可进行相应调整",{"key":24,"text":502,"correct":22},"合同执行过程中，工程量与招标文件不符时，合同总价可进行相应调整",{"key":27,"text":504,"correct":22},"合同执行过程中，发包方承担主要风险，合同总价通常偏低",{"key":31,"text":506,"correct":29},"合同执行过程中，承包方承担主要风险，合同总价通常偏高",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":31,"analysis":33},1107802,"采用“最高限额成本加固定最大酬金合同”方式，若承包方要获得成本、酬金的支付以及分享节约额则必须是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":22},"实际成本在预期成本和报价成本之间",{"key":24,"text":514,"correct":22},"实际工程成本在报价成本和限额成本之间",{"key":27,"text":516,"correct":22},"实际工程成本超过限额成本",{"key":31,"text":518,"correct":29},"实际成本低于预期成本",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":20,"analysis":33},1107803,"合同总价只有在设计和工程范围发生变更时才能随之作相应调整，除此之外一般不得变更的合同称为（ ）。",[523,524,525,526],{"key":20,"text":100,"correct":29},{"key":24,"text":386,"correct":22},{"key":27,"text":390,"correct":22},{"key":31,"text":75,"correct":22},{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":27,"analysis":33},1107804,"总价合同是以（ ）为依据，由发承包方经过协商确定的。",[531,533,535,537],{"key":20,"text":532,"correct":22},"招标控制价和设计图纸",{"key":24,"text":534,"correct":22},"工程量清单和工程说明书",{"key":27,"text":536,"correct":29},"设计图纸和工程说明书",{"key":31,"text":538,"correct":22},"工程量清单和招标控制价",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":31,"analysis":33},1107805,"对于抢险救灾工程，适合采用（ ）。",[543,544,545,546],{"key":20,"text":386,"correct":22},{"key":24,"text":79,"correct":22},{"key":27,"text":75,"correct":22},{"key":31,"text":103,"correct":29},{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},1107806,"可调总价合同的风险分担方式为（ ）。",[551,553,555,557],{"key":20,"text":552,"correct":22},"承包方承担通货膨胀风险，发包方承担其他风险",{"key":24,"text":554,"correct":29},"发包方承担通货膨胀风险，承包方承担其他风险",{"key":27,"text":556,"correct":22},"承包方承担一切风险",{"key":31,"text":558,"correct":22},"发包方承担一切风险",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},1107807,"在招投标过程中，如果招标工程清单项目特征描述与设计图纸不符，投标人应以（ ）为准，确定投标报价的综合单价。",[563,565,567,569],{"key":20,"text":564,"correct":29},"招标工程清单的项目特征描述",{"key":24,"text":566,"correct":22},"设计图纸的项目特征描述",{"key":27,"text":568,"correct":22},"设计变更的项目特征描述",{"key":31,"text":570,"correct":22},"工程量清单的项目特征描述",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},1107808,"投标人投标报价时应依据（ ）确定清单项目的综合单价。",[575,576,578,580],{"key":20,"text":89,"correct":22},{"key":24,"text":577,"correct":22},"实际施工的项目特征",{"key":27,"text":579,"correct":22},"设计图纸",{"key":31,"text":581,"correct":29},"招标工程量清单项目的特征描述",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1107809,"当招标人仅要求总包人对其发包的专业工程进行现场协调和统一管理、对竣工资料进行统一汇总整理等服务时，总承包服务费按发包的专业工程估算造价的（ ）左右计算。",[586,587,589,591],{"key":20,"text":132,"correct":29},{"key":24,"text":588,"correct":22},"2.5%",{"key":27,"text":590,"correct":22},"3.5%",{"key":31,"text":592,"correct":22},"3.0%",[594,597,600,603,606,609],{"id":15,"name":595,"category":7,"favorite":596},"领导干部任职前廉政法规知识测试题",92,{"id":598,"name":599,"category":7,"favorite":15},595,"建筑结构与设备",{"id":601,"name":602,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":604,"name":605,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":607,"name":608,"category":7,"favorite":8},534,"BIM工程师",{"id":610,"name":608,"category":7,"favorite":8},535]