[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,11,50,2641,[13,34,43,55,67,75,87,99,111,123,135,147,159,171,183,195,207,219,231,243,254,266,278,290,302,314,326,338,350,362,374,386,395,407,419,431,443,455,467,479,491,503,512,524,536,548,560,572,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1107708,1,"单选题","对返还期限没有约定或者约定不明确的，发包人应当在核实后（ ）天内将保证金返还承包人，逾期未返还的，依法承担违约责任。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","7",false,{"key":24,"text":25,"correct":22},"B","10",{"key":27,"text":28,"correct":29},"C","14",true,{"key":31,"text":32,"correct":22},"D","28","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1107709,"如承包人在发包人签发竣工付款证书后（ ）天内提交质量保证金保函，发包人应同时退还扣留的作为质量保证金的工程价款。",[38,39,40,41],{"key":20,"text":21,"correct":22},{"key":24,"text":28,"correct":22},{"key":27,"text":32,"correct":29},{"key":31,"text":42,"correct":22},"42",{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":45,"options":46,"answer":24,"analysis":33},1107710,"对于隐蔽工程的验收，需要（ ）人以上签证。",[47,49,51,53],{"key":20,"text":48,"correct":22},"1",{"key":24,"text":50,"correct":29},"2",{"key":27,"text":52,"correct":22},"3",{"key":31,"text":54,"correct":22},"4",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":20,"analysis":33},1107711,"发包人对工程质量有异议，拒绝办理工程竣工结算，已竣工未验收但实际已投入使用的工程，其质量争议应（ ）。",[59,61,63,65],{"key":20,"text":60,"correct":29},"按该工程的保修合同执行",{"key":24,"text":62,"correct":22},"根据具有相应资质的检测鉴定机构的检测结果确定解决方案",{"key":27,"text":64,"correct":22},"按工程质量监督机构的处理决定执行",{"key":31,"text":66,"correct":22},"由工程造价管理机构负责解释",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":27,"analysis":33},1107712,"发包人核实承包人提交的竣工结算文件后，认为还需进一步补充资料和修改结算文件，则承包人在收到核实意见后的（ ）天内按照发包人提出的要求补偿相关资料并再次提交发包人复核。",[71,72,73,74],{"key":20,"text":21,"correct":22},{"key":24,"text":28,"correct":22},{"key":27,"text":32,"correct":29},{"key":31,"text":42,"correct":22},{"id":76,"libraryId":5,"type":15,"typeLabel":16,"stem":77,"options":78,"answer":31,"analysis":33},1107713,"计算竣工结算的其他项目费时，计日工应按（ ）计算。",[79,81,83,85],{"key":20,"text":80,"correct":22},"双方协商确认的金额",{"key":24,"text":82,"correct":22},"合同约定金额",{"key":27,"text":84,"correct":22},"发包人批准的金额",{"key":31,"text":86,"correct":29},"发包人实际签证确认的事项",{"id":88,"libraryId":5,"type":15,"typeLabel":16,"stem":89,"options":90,"answer":24,"analysis":33},1107714,"下列关于进度款说法中，正确的是（ ）。",[91,93,95,97],{"key":20,"text":92,"correct":22},"已标价工程量清单中的单价项目，如综合单价发生调整的，承包人应按工程计量确认的工程量与综合单价计算",{"key":24,"text":94,"correct":29},"已标价工程量清单中的总价项目，承包人应按合同中约定的进度款支付分解，分别列入进度款支付申请中的安全文明施工费和本周期应支付的总价项目的金额中",{"key":27,"text":96,"correct":22},"发包人提供的甲供材料金额，应按照发包人签约提供的单价和数量从预付款支付中扣出",{"key":31,"text":98,"correct":22},"进度款的支付比例按照合同约定，按期中结算价款总额计不高于60%",{"id":100,"libraryId":5,"type":15,"typeLabel":16,"stem":101,"options":102,"answer":31,"analysis":33},1107715,"根据《标准施工招标文件》，施工过程中监理人对隐蔽工程重新检查，经检查证明工程质量符合合同要求的，则承包商有权索赔（ ）。",[103,105,107,109],{"key":20,"text":104,"correct":22},"费用，但不包括工期",{"key":24,"text":106,"correct":22},"工期.费用，但不包括利润",{"key":27,"text":108,"correct":22},"工期，但不包括费用",{"key":31,"text":110,"correct":29},"工期.费用和利润",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":27,"analysis":33},1107716,"在青藏铁路施工过程中发现文物、古迹，为解决此问题承包商花费了大量的时间和金钱，则承包商有权索赔（ ）。",[115,117,119,121],{"key":20,"text":116,"correct":22},"费用，但不包括工期和利润",{"key":24,"text":118,"correct":22},"费用和利润，但不包括工期",{"key":27,"text":120,"correct":29},"费用和工期，但不包括利润",{"key":31,"text":122,"correct":22},"费用.工期和利润",{"id":124,"libraryId":5,"type":15,"typeLabel":16,"stem":125,"options":126,"answer":20,"analysis":33},1107717,"根据《建设工程工程量清单计价规范》（GB 50500-2013）的规定，对于特殊反常的天气原因影响施工，承包人可以索赔（ ）。",[127,129,131,133],{"key":20,"text":128,"correct":29},"工期",{"key":24,"text":130,"correct":22},"工期+费用",{"key":27,"text":132,"correct":22},"工期+费用+利润",{"key":31,"text":134,"correct":22},"费用",{"id":136,"libraryId":5,"type":15,"typeLabel":16,"stem":137,"options":138,"answer":27,"analysis":33},1107718,"根据《建设工程工程量清单计价规范》（GB 50500-2013）的规定，下列属于业主向承包商索赔的是（ ）。",[139,141,143,145],{"key":20,"text":140,"correct":22},"工程变更引起的索赔",{"key":24,"text":142,"correct":22},"加速施工费用的索赔",{"key":27,"text":144,"correct":29},"承包商不正当地放弃工程的索赔",{"key":31,"text":146,"correct":22},"发包人不正当地中止工程而引起的索赔",{"id":148,"libraryId":5,"type":15,"typeLabel":16,"stem":149,"options":150,"answer":31,"analysis":33},1107719,"在处理工程变更过程中，（ ）审查承包人提出的工程变更申请，提出审查意见，并对工程变更费用及工期影响做出评估。",[151,153,155,157],{"key":20,"text":152,"correct":22},"总监理工程师",{"key":24,"text":154,"correct":22},"专业监理工程师",{"key":27,"text":156,"correct":22},"总监理工程师组织发包人.承包人",{"key":31,"text":158,"correct":29},"总监理工程师组织专业监理工程师",{"id":160,"libraryId":5,"type":15,"typeLabel":16,"stem":161,"options":162,"answer":31,"analysis":33},1107720,"已签约合同价中的暂列金额由（ ）负责掌握使用。",[163,165,167,169],{"key":20,"text":164,"correct":22},"承包人",{"key":24,"text":166,"correct":22},"监理人",{"key":27,"text":168,"correct":22},"贷款人",{"key":31,"text":170,"correct":29},"发包人",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":31,"analysis":33},1107721,"根据《建设工程量清单计价规范》（GB 50500－2013），工程发包时，招标人要求索赔的工期天数超过定额工期（ ）时，应当在招标文件中明示增加赶工费用。",[175,177,179,181],{"key":20,"text":176,"correct":22},"5%",{"key":24,"text":178,"correct":22},"10%",{"key":27,"text":180,"correct":22},"15%",{"key":31,"text":182,"correct":29},"20%",{"id":184,"libraryId":5,"type":15,"typeLabel":16,"stem":185,"options":186,"answer":27,"analysis":33},1107722,"某工程5月份工程款为800万元。合同约定当发生物价变化时，按照价格指数进行价格调整，项目施工至5月份起发生物价变化，其中人工费上涨5%，材料费中钢材价格上涨3%，其他项目价格未发生变化。人工费占工程款30%；材料费占50%（其中钢材占材料费的70%）；机械费占15%，其他项目占5%。则调整后5月份工程款是（ ）万元。",[187,189,191,193],{"key":20,"text":188,"correct":22},"700.3",{"key":24,"text":190,"correct":22},"775.1",{"key":27,"text":192,"correct":29},"820.4",{"key":31,"text":194,"correct":22},"944.0",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":20,"analysis":33},1107723,"某学校教学楼工程，原定于2014年10月竣工，由于施工方原因导致工期延误，2014年11月竣工。原10月份的价格指数为110%，11月份的价格指数为120%，则对11月份施工的工程，在使用价格调整公式时，应选用（ ）作为现行价格指数。",[199,201,203,205],{"key":20,"text":200,"correct":29},"110%",{"key":24,"text":202,"correct":22},"120%",{"key":27,"text":204,"correct":22},"105%",{"key":31,"text":206,"correct":22},"100%",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":27,"analysis":33},1107724,"根据《建设工程工程量清单计价规范》GB 50500－2013，下列有关计日工的表述正确的是（ ）。",[211,213,215,217],{"key":20,"text":212,"correct":22},"承包人完成发包人提出的工程合同范围以内的零星工作，以计日工的形式计价",{"key":24,"text":214,"correct":22},"发包人提交有计日工记录汇总的现场签证报告应一式三份",{"key":27,"text":216,"correct":29},"发包人应当在收到承包人提交现场签证报告后的2天内予以确认",{"key":31,"text":218,"correct":22},"发包人逾期未确认的现场签证报告，不应视为发包人认可",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":31,"analysis":33},1107725,"某工程原定2017年9月30日竣工，因承包人原因，致使工程延至2017年12月30日竣工。但在2017年10月因法律法规的变化导致工程造价增加100万元，则该工程合同价款的正确处理方式是（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":22},"调增50万元",{"key":24,"text":226,"correct":22},"调增75万元",{"key":27,"text":228,"correct":22},"调增100万元",{"key":31,"text":230,"correct":29},"不予调增",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":31,"analysis":33},1107726,"某工程原定2018年9月20日竣工，因承包人原因，致使工程延至2018年10月20日竣工。而且在2018年10月因法规的变化导致工程造价增加120万元，则该工程的合同价款应（ ）。",[235,237,239,241],{"key":20,"text":236,"correct":22},"调增60万元",{"key":24,"text":238,"correct":22},"调增90万元",{"key":27,"text":240,"correct":22},"调增120万元",{"key":31,"text":242,"correct":29},"不予调整",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":24,"analysis":33},1107727,"对主要技术方案进行技术经济分析，这属于（ ）的工作。",[247,248,250,252],{"key":20,"text":170,"correct":22},{"key":24,"text":249,"correct":29},"监理工程师",{"key":27,"text":251,"correct":22},"设计人员",{"key":31,"text":253,"correct":22},"承包单位",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":31,"analysis":33},1107728,"关于编制最高投标限价时总承包服务费的可参考标准，下列说法正确的是（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":22},"招标人仅要求对分包专业工程进行总承包管理和协调时，按分包专业工程估算造价的0.5%计算",{"key":24,"text":261,"correct":22},"招标人仅要求对分包专业工程进行总承包管理和协调时，按分包专业工程估算造价的1%计算",{"key":27,"text":263,"correct":22},"招标人要求对分包专业工程进行总承包管理和协调，且要求提供配合服务时，按分包专业工程估算造价的1%～3%计算",{"key":31,"text":265,"correct":29},"招标人要求对分包专业工程进行总承包管理和协调，且要求提供配合服务时，按分包专业工程估算造价的3%～5%计算",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":31,"analysis":33},1107729,"根据《建设工程工程量清单计价规范》（GB 50500-2013）中对招标控制价的有关规定，下列说法正确的是（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"招标控制价公布后根据需要可以上浮或下调",{"key":24,"text":273,"correct":22},"招标人可以只公布招标控制价总价，也可以只公布单价",{"key":27,"text":275,"correct":22},"招标控制价可以在招标文件中公布，也可以在开标时公布",{"key":31,"text":277,"correct":29},"招标控制价报工程所在地工程造价管理机构备查",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":31,"analysis":33},1107730,"根据《计价规范》的规定，下列说法中错误的是（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":22},"国有资金投资项目必须采用工程量清单计价",{"key":24,"text":285,"correct":22},"工程量清单是调整工程量、进行工程索赔的依据",{"key":27,"text":287,"correct":22},"不采用工程量清单计价的建设工程，应执行规范除工程量清单等专门规定外的其他规定",{"key":31,"text":289,"correct":29},"补充项目清单由工程造价管理机构编制",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":20,"analysis":33},1107731,"根据《计价规范》，分部分项工程量清单中的工程数量应按（ ）计算。",[294,296,298,300],{"key":20,"text":295,"correct":29},"设计文件图示尺寸的工程量净值",{"key":24,"text":297,"correct":22},"设计文件结合不同施工方案确定的工程量平均值",{"key":27,"text":299,"correct":22},"工程实体量和损耗量之和",{"key":31,"text":301,"correct":22},"实际施工完成的全部工程量",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":31,"analysis":33},1107732,"根据《建设工程工程量清单计价规范》（GB50500-2013），关于工程量清单编制的说法，正确的是（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"综合单价包括应由招标人承担的全部风险费用",{"key":24,"text":309,"correct":22},"招标文件提供了暂估单价的材料，其材料费用应计入其他项目清单费",{"key":27,"text":311,"correct":22},"措施项目费包括规费、税金等在内",{"key":31,"text":313,"correct":29},"规费和税金必须按有关部门的规定计算，不得作为竞争性费用",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":24,"analysis":33},1107733,"根据《建设工程工程量清单计价规范》（GB 50500-2013）的规定，下列有关招标控制价的编制说法正确的是（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"投标人应根据国家或省级.行业建设主管部门的规定标准对安全文明施工费计价",{"key":24,"text":321,"correct":29},"暂列金额按照工程量清单中列出的金额填写",{"key":27,"text":323,"correct":22},"招标人给出计日工的暂定数量，投标人填写单价",{"key":31,"text":325,"correct":22},"若国家税法发生变化或调整，招标人可以不对税金清单作出相应调整",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},1107734,"（ ）是招标人根据国家或省级、行业建设主管部门颁发的有关计价依据和办法，以及拟定的招标文件和招标工程量清单，结合工程具体情况编制的招标工程的最高投标限价。",[330,332,334,336],{"key":20,"text":331,"correct":22},"概算",{"key":24,"text":333,"correct":22},"中标价",{"key":27,"text":335,"correct":29},"招标控制价",{"key":31,"text":337,"correct":22},"工程标底价格",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":31,"analysis":33},1107735,"根据《建设工程工程量清单计价规范》GB 50500－2013的规定，关于编制招标控制价的说法正确的是（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"综合单价应包括由招标人承担的费用及风险",{"key":24,"text":345,"correct":22},"安全文明施工费按投标人的施工组织设计确定",{"key":27,"text":347,"correct":22},"措施项目费应为包括规费.税金在内的全部费用",{"key":31,"text":349,"correct":29},"暂估价中的材料单价，应按招标工程量清单的单价计入综合单价",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":31,"analysis":33},1107736,"建设工程项目招标时，工程量清单通常由（ ）提供。",[354,356,358,360],{"key":20,"text":355,"correct":22},"造价单位",{"key":24,"text":357,"correct":22},"施工单位",{"key":27,"text":359,"correct":22},"咨询单位",{"key":31,"text":361,"correct":29},"建设单位",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},1107737,"根据《建设工程工程量清单计价规范》（GB50500－2013），编制工程量清单时，计日工表中的人工应按（ ）列项。",[366,368,370,372],{"key":20,"text":367,"correct":29},"工种",{"key":24,"text":369,"correct":22},"职称",{"key":27,"text":371,"correct":22},"职务",{"key":31,"text":373,"correct":22},"技术等级",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":27,"analysis":33},1107738,"根据《建设工程工程量清单计价规范》，分部分项工程项目清单中的分项工程项目名称顺序码的数位是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"三至四位",{"key":24,"text":381,"correct":22},"五至六位",{"key":27,"text":383,"correct":29},"七至九位",{"key":31,"text":385,"correct":22},"十至十二位",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":24,"analysis":33},1107740,"项目编码是分部分项工程量清单项目名称的数字标示，其中（ ）是分部工程顺序码。",[390,391,392,394],{"key":20,"text":379,"correct":22},{"key":24,"text":381,"correct":29},{"key":27,"text":393,"correct":22},"七.八.九位",{"key":31,"text":385,"correct":22},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":31,"analysis":33},1107741,"工程量清单的十二位项目编码中，七至九位表示（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"分类顺序码",{"key":24,"text":402,"correct":22},"专业工程码",{"key":27,"text":404,"correct":22},"分部工程顺序码",{"key":31,"text":406,"correct":29},"分项工程项目名称顺序码",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1107742,"如果招标工程清单项目特征描述与设计图纸不符，投标人应以（ ）为准，确定投标报价的综合单价。",[411,413,415,417],{"key":20,"text":412,"correct":29},"招标工程清单的项目特征描述",{"key":24,"text":414,"correct":22},"设计图纸的项目特征描述",{"key":27,"text":416,"correct":22},"设计变更的项目特征描述",{"key":31,"text":418,"correct":22},"实际施工的项目特征描述",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},1107743,"根据《建设工程工程量清单计价规范》，关于投标人的投标总价编制的说法，正确的是（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"为降低投标总价，投标人可以将暂列金额降至零",{"key":24,"text":426,"correct":22},"投标总价可在分部分项工程费、措施项目费、其他项目费和规费，税金合计金额上做出优惠",{"key":27,"text":428,"correct":22},"开标前投标人来不及修改标书时，可在投标者致函中给出优惠比例，并将优惠后的总价作为新的投标价",{"key":31,"text":430,"correct":29},"投标人对投标报价的任何优惠均应反映在相应清单项目的综合单价中",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":24,"analysis":33},1107744,"某多层砖混住宅工程的基础开挖土方工程量按照工程量计算规则计算的清单工程量为230立方，按照施工方案及工程量计算规则计算的定额工程量为450立方，定额单位为10立方，计算挖基础土方清单含量为（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"19.565",{"key":24,"text":438,"correct":29},"0.196",{"key":27,"text":440,"correct":22},"0.511",{"key":31,"text":442,"correct":22},"0.051",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":27,"analysis":33},1107745,"某挖沟槽土方项目招标，工程量清单中的土方开挖工程量为200m3，投标人按施工方案计算得到的预算工程量为300m3，按企业定额该子项基价为100元\u002Fm3，则该土方开挖的单位报价应为（ ）元\u002Fm3。",[447,449,451,453],{"key":20,"text":448,"correct":22},"300",{"key":24,"text":450,"correct":22},"200",{"key":27,"text":452,"correct":29},"150",{"key":31,"text":454,"correct":22},"100",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},1107747,"不能促使承包人降低工程成本，甚至最可能“鼓励”其增大工程成本的合同形式是（ ）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"成本加固定金额酬金合同",{"key":24,"text":462,"correct":29},"成本加固定百分比酬金合同",{"key":27,"text":464,"correct":22},"成本加奖罚合同",{"key":31,"text":466,"correct":22},"最高限额成本加固定最大酬金合同",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":20,"analysis":33},1107748,"采用单价合同，最后工程结算的实际总价是根据（ ）确定的。",[471,473,475,477],{"key":20,"text":472,"correct":29},"实际完成的工程量及承包方所填报的单价",{"key":24,"text":474,"correct":22},"发包方提供的清单工程量及承包方所填报的单价",{"key":27,"text":476,"correct":22},"发包方提供的清单工程量及承包方实际发生的单价",{"key":31,"text":478,"correct":22},"实际完成的工程量及承包方实际发生的单价",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":27,"analysis":33},1107749,"下列关于单价合同的说法正确的是（ ）。",[483,485,487,489],{"key":20,"text":484,"correct":22},"单价合同的工程量清单内所列出的分部分项工程的工程量为准确工程量",{"key":24,"text":486,"correct":22},"执行单价合同，工程量及合同单价在合同实施过程中允许有浮动变化",{"key":27,"text":488,"correct":29},"单价合同结算时，以实际完成工程量为依据",{"key":31,"text":490,"correct":22},"采用单价合同，实际工程价格与合同价格必定一致",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},1107750,"根据《计价规范》的规定，招标文件与中标人的投标文件出现不一致，以（ ）为准。",[495,497,499,501],{"key":20,"text":496,"correct":22},"招标文件",{"key":24,"text":498,"correct":29},"投标文件",{"key":27,"text":500,"correct":22},"计价规范",{"key":31,"text":502,"correct":22},"双方协商结果",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},1107751,"如果施工中出现施工索赔与现场签证，通常由承包人在索赔事件发生后的（ ）天内提出索赔金额。",[507,508,509,510],{"key":20,"text":21,"correct":22},{"key":24,"text":28,"correct":22},{"key":27,"text":32,"correct":29},{"key":31,"text":511,"correct":22},"30",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":31,"analysis":33},1107752,"采用成本加奖罚合同，当实际成本大于预期成本时，承包人可以得到（ ）。",[516,518,520,522],{"key":20,"text":517,"correct":22},"工程成本.酬金和预先约定的奖金",{"key":24,"text":519,"correct":22},"工程成本和预先约定的奖金，不能得到酬金",{"key":27,"text":521,"correct":22},"工程成本，但不能得到酬金和预先约定的奖金",{"key":31,"text":523,"correct":29},"工程成本和酬金，但也可能会处予一笔罚金",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1107753,"（ ）合同以工程量清单和相应的综合单价表为基础和依据来计算合同价格，较为合理地分担了合同履行过程中的风险。",[528,530,532,534],{"key":20,"text":529,"correct":22},"固定总价",{"key":24,"text":531,"correct":29},"估算工程量单价",{"key":27,"text":533,"correct":22},"纯单价",{"key":31,"text":535,"correct":22},"可调单价",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":31,"analysis":33},1107754,"某土方工程《建设工程工程量清单计价规范》签订了单价合同，招标清单中土方开挖工程量为8000m3，施工过程中承包人采用了放坡的开挖方式，完工计量时，承包人因放坡增加土方开挖量1000m3，因工作面增加土方开挖量1600m3，因施工操作不慎造成塌方增加的土方开挖量500m3，则应予结算的土方开挖工程量为（ ）m3。",[540,542,544,546],{"key":20,"text":541,"correct":22},"11100",{"key":24,"text":543,"correct":22},"10600",{"key":27,"text":545,"correct":22},"9000",{"key":31,"text":547,"correct":29},"8000",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":31,"analysis":33},1107755,"根据《计价规范》规定，在其他项目清单中，应包括（ ）。",[552,554,556,558],{"key":20,"text":553,"correct":22},"环境保护费",{"key":24,"text":555,"correct":22},"夜间施工费",{"key":27,"text":557,"correct":22},"施工排水费",{"key":31,"text":559,"correct":29},"暂估价",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":20,"analysis":33},1107756,"根据《建设工程量清单计价规范》（GB50500-2013），分部分项工程清单综合单价应包含（ ）以及一定范围内的风险费用。",[564,566,568,570],{"key":20,"text":565,"correct":29},"人工费、材料和工程设备费、施工机具使用费、企业管理费、利润",{"key":24,"text":567,"correct":22},"人工费、材料费、施工机具使用费、企业管理费、规费",{"key":27,"text":569,"correct":22},"人工费、材料和工程设备费、施工机具使用费、规费、利润、税金",{"key":31,"text":571,"correct":22},"材料费、工程设备费、施工机具使用费、规费、税金、企业管理费",{"id":573,"libraryId":5,"type":15,"typeLabel":16,"stem":574,"options":575,"answer":24,"analysis":33},1107757,"某高层建筑住宅楼工程的施工图设计已经完成，且计划工期为24个月，其应采用（ ）合同。",[576,577,579,581],{"key":20,"text":529,"correct":22},{"key":24,"text":578,"correct":29},"可调总价",{"key":27,"text":580,"correct":22},"估计工程量单价",{"key":31,"text":535,"correct":22},{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":20,"analysis":33},1107758,"实行工程量清单计价的工程，应当采用（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":29},"单价合同",{"key":24,"text":589,"correct":22},"综合单价合同",{"key":27,"text":591,"correct":22},"总价合同",{"key":31,"text":593,"correct":22},"成本加酬金合同",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":31,"analysis":33},1107759,"采用“最高限额成本加固定最大酬金合同”方式，若承包人要获得成本、酬金的支付以及分享节约额，则必须是（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"实际成本在预期成本和报价成本之间",{"key":24,"text":601,"correct":22},"实际工程成本在报价成本和限额成本之间",{"key":27,"text":603,"correct":22},"实际工程成本超过限额成本",{"key":31,"text":605,"correct":29},"实际成本低于预期成本",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]