[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":596},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,10,50,2641,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,187,195,207,219,231,243,255,267,279,291,303,312,321,329,341,353,365,377,389,401,413,425,437,447,459,471,483,493,505,514,526,538,550,562,574,586],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1107658,1,"单选题","某钢筋混凝土结构分项工程，某月份的计划单价和计划工程量分别为350元\u002Fm3和3000m3，该月份的实际单价和实际完成工程量分别为360元\u002Fm3和3200m3。则利用赢得值法计算出的该月份混凝土工程的投资绩效指数（CPI）为（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","0.97",true,{"key":24,"text":25,"correct":26},"B","1.03",false,{"key":28,"text":29,"correct":26},"C","1.06",{"key":31,"text":32,"correct":26},"D","0.94","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1107659,"关于最终结清的阐述中，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"质量保修期终止后，承包人应按照合同约定向发包人提交最终结清支付申请",{"key":24,"text":41,"correct":26},"发包人收到最终结清支付申请后的7天内予以核实",{"key":28,"text":43,"correct":22},"发包人应在签发最终结清支付证书后的14天内，向承包人支付",{"key":31,"text":45,"correct":26},"承包人被扣留的质量保证金不足以扣减发包人工程缺陷修复费用的，按争议解决方式处理",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1107660,"关于质量保证金的阐述中，错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"承包人未按合同约定履行工程缺陷修复义务的，发包人有权从质量保证金中扣留修复支出",{"key":24,"text":53,"correct":22},"工程缺陷属于发包人原因造成的，承包人承担查验和缺陷修复的费用",{"key":28,"text":55,"correct":26},"缺陷责任期终止后，发包人将剩余的质量保证金返还承包人",{"key":31,"text":57,"correct":26},"返还剩余的质量保证金不能免除承包人的质量保修义务",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1107661,"某建设工程施工过程中，由发包人供应的材料没有及时到货，导致承包人的工人窝工5个工作日，窝工工日单价200元；承包人租赁的一台挖土机窝工5个台班，台班租赁费500元；承包人自卸汽车窝工2个台班，该自卸汽车折旧费每台300元，工作时燃油动力费每台班80元。则承包人可以索赔的费用是（ ）元。",[62,64,66,68],{"key":20,"text":63,"correct":26},"2500",{"key":24,"text":65,"correct":26},"3500",{"key":28,"text":67,"correct":26},"4260",{"key":31,"text":69,"correct":22},"4100",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1107662,"在索赔费用计算方法中，最为常用、准确的是方法（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"实际费用法",{"key":24,"text":77,"correct":26},"总费用法",{"key":28,"text":79,"correct":26},"修正的总费用法",{"key":31,"text":81,"correct":26},"实物法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1107663,"根据“计价规范”的规定，暂列金额由（ ）根据工程特点，按有关计价规定估算，施工过程中由（ ）掌握使用、扣除合同价款调整后如有余额，归（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"发包人、发包人、发包人",{"key":24,"text":89,"correct":26},"发包人、监理人、发包人",{"key":28,"text":91,"correct":26},"监理人、监理人、发包人",{"key":31,"text":93,"correct":26},"监理人、监理人、监理人",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1107664,"某工程在施工过程中，因不可抗力造成损失，承包人及时向项目监理机构提出了索赔申请，并附有相关证明材料，要求补偿的经济损失如下：（1）在建工程损失30万元；（2）承包人的施工机械设备损坏损失5万元；（3）承包人受伤人员医药费和补偿金4.5万元；（4）工程清理修复费用2万元。根据《建设工程工程量清单计价规范》，监理人应批准的补偿金额为（ ）万元。",[98,100,102,104],{"key":20,"text":99,"correct":22},"32.0",{"key":24,"text":101,"correct":26},"36.5",{"key":28,"text":103,"correct":26},"37.0",{"key":31,"text":105,"correct":26},"41.5",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1107665,"根据《计价规范》的规定，下列计日工生效原则的描述中，正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"发包人通知承包人后，承包人应予执行",{"key":24,"text":113,"correct":26},"承包人应在该项工作实施结束后的48小时内向发包人提交现场签证报告",{"key":28,"text":115,"correct":26},"发包人在收到承包人计日工报告后的7天内予以确认",{"key":31,"text":117,"correct":26},"发包人将一式三份确认的报告返还给承包人，作为计日工计价和支付的依据",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1107666,"关于单价合同中工程量计算的说法，正确的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":26},"单价合同应予计量的工程量是承包人实际施工的工程量",{"key":24,"text":125,"correct":26},"承包人因自身原因造成返工的工程量应予计量",{"key":28,"text":127,"correct":22},"工程计量应以设计图纸为依据",{"key":31,"text":129,"correct":26},"承包人为保证工程质量超过图纸要求的工程量应予计量",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},1107667,"按子项目进行建设投资目标的分解时，一般可将建筑安装工程费用分解到（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"建设项目",{"key":24,"text":137,"correct":26},"单位工程",{"key":28,"text":139,"correct":26},"分部工程",{"key":31,"text":141,"correct":22},"分项工程",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1107668,"发包人应在工程开工后的28天内预付不低于当年施工进度计划的安全文明施工费总额的（ ），其余部分按照提前安排的原则进行分解，与进度款同期支付。",[146,148,150,152],{"key":20,"text":147,"correct":26},"50%",{"key":24,"text":149,"correct":22},"60%",{"key":28,"text":151,"correct":26},"80%",{"key":31,"text":153,"correct":26},"90%",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},1107669,"根据现行规定，以下安全文明施工费的说法正确是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":26},"发包人应在工程开工后的14天内预付当年的安全文明施工费",{"key":24,"text":161,"correct":26},"发包人应预付不低于当年施工进度计划的安全文明施工费总额的50%",{"key":28,"text":163,"correct":22},"发包人没有按时支付安全文明施工费的，承包人可催告发包人支付",{"key":31,"text":165,"correct":26},"发包人在付款期满后的14天内仍未支付的，若发生安全事故，发包人应承担相应责任",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1107670,"不可抗力发生后，承包人的施工机械设备损坏及停工损失，应由（ ）承担。",[170,172,174,176],{"key":20,"text":171,"correct":26},"监理人",{"key":24,"text":173,"correct":22},"承包人",{"key":28,"text":175,"correct":26},"发包人",{"key":31,"text":177,"correct":26},"发包人和监理人共同承担",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},1107671,"不可抗力中，合同工程本身的损害、因工程损害导致第三方人员伤亡和财产损失以及运至施工场地用于施工的材料的损害，由（ ）承担。",[182,183,184,185],{"key":20,"text":173,"correct":26},{"key":24,"text":175,"correct":22},{"key":28,"text":171,"correct":26},{"key":31,"text":186,"correct":26},"各方均摊",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1107672,"某工程在施工过程中，因不可抗力造成损失，承包人及时向项目监理机构提出了索赔申请，并附有相关证明材料，要求补偿的经济损失如下：（1）在建工程损失30万元；（2）承包人的施工机械设备损坏损失5万元；（3）承包人受伤人员医药费和补偿金4.5万元；（4）工程清理修复费用2万元。根据《建设工程施工合同（示范文本）》，项目监理机构应批准的补偿金额为（ ）万元。",[191,192,193,194],{"key":20,"text":99,"correct":22},{"key":24,"text":101,"correct":26},{"key":28,"text":103,"correct":26},{"key":31,"text":105,"correct":26},{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":31,"analysis":33},1107673,"对于取土坑或填筑路堤土方，一般采用（ ）进行计量。",[199,201,203,205],{"key":20,"text":200,"correct":26},"估价法",{"key":24,"text":202,"correct":26},"凭据法",{"key":28,"text":204,"correct":26},"均摊法",{"key":31,"text":206,"correct":22},"断面法",{"id":208,"libraryId":5,"type":15,"typeLabel":16,"stem":209,"options":210,"answer":20,"analysis":33},1107674,"根据《建设工程施工合同（示范成本）》GF－2017－0201，监理人未在收到承包人提交的工程量报表后的（ ）天内完成审核的，承包人报送的工程量报告中的工程量视为承包人实际完成的工程量，据此计算工程价款。",[211,213,215,217],{"key":20,"text":212,"correct":22},"7",{"key":24,"text":214,"correct":26},"14",{"key":28,"text":216,"correct":26},"21",{"key":31,"text":218,"correct":26},"28",{"id":220,"libraryId":5,"type":15,"typeLabel":16,"stem":221,"options":222,"answer":20,"analysis":33},1107675,"某工程因承包人原因致使原定竣工时间延误，延误期间内国家政策发生变化，由此引起的合同价款调整应遵循的原则是（ ）。",[223,225,227,229],{"key":20,"text":224,"correct":22},"调增的不予调整，调减的予以调整",{"key":24,"text":226,"correct":26},"调增和调减均予以调整",{"key":28,"text":228,"correct":26},"调增和调减均不予调整",{"key":31,"text":230,"correct":26},"调增的予以调整，调减的不予调整",{"id":232,"libraryId":5,"type":15,"typeLabel":16,"stem":233,"options":234,"answer":20,"analysis":33},1107676,"某非招标项目，承包人报价值为2000万元，类似项目的合同价为1900万元。该项目承包人施工图预算为2050万元。则承包人报价浮动率是（ ）。",[235,237,239,241],{"key":20,"text":236,"correct":22},"2.44%",{"key":24,"text":238,"correct":26},"3.87%",{"key":28,"text":240,"correct":26},"5.00%",{"key":31,"text":242,"correct":26},"7.31%",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":28,"analysis":33},1107677,"某项目的独立基础工程，招标文件中估计工程量1万m3，合同中约定独立基础工程单价为40元\u002Fm3，当实际工程量的变化超过估计工程量15%时，需调整单价，调整系数为1.1（0.9），该工程结算时完成土方工程量为1.5万m3，则独立基础工程款为（ ）万元。",[247,249,251,253],{"key":20,"text":248,"correct":26},"54.0",{"key":24,"text":250,"correct":26},"58.0",{"key":28,"text":252,"correct":22},"58.6",{"key":31,"text":254,"correct":26},"66.0",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":31,"analysis":33},1107678,"某分项工程招标工程量清单为1000m3。施工中由于设计变更调整为1200m3。该分项工程招标控制价单价为300元\u002Fm3。投标报价单价为380元\u002Fm3。根据《建设工程工程量清单计价规范》，该分项工程的结算款为（ ）元。",[259,261,263,265],{"key":20,"text":260,"correct":26},"430000",{"key":24,"text":262,"correct":26},"449000",{"key":28,"text":264,"correct":26},"442000",{"key":31,"text":266,"correct":22},"454250",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},1107679,"在投资偏差原因分析中，属于物价上涨原因的是（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":22},"利率.汇率变化",{"key":24,"text":274,"correct":26},"工期拖延",{"key":28,"text":276,"correct":26},"协调不佳",{"key":31,"text":278,"correct":26},"法规变化",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":31,"analysis":33},1107680,"某发承包合同约定，项目采暖工程中某永久设备由发包人负责采购，施工过程中，发包人按约定时间将设备交由承包人，承包人进行检验后发现该设备不符合合同要求，故报监理工程师，要向发包人索赔。下列有关索赔的内容，表述最准确的一项是（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":26},"工期",{"key":24,"text":286,"correct":26},"工期＋费用",{"key":28,"text":288,"correct":26},"费用＋利润",{"key":31,"text":290,"correct":22},"工期＋费用＋利润",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":31,"analysis":33},1107681,"根据《标准施工招标文件》，对于因异常恶劣的气候造成施工单位的施工机械损坏和人员窝工以及相应的费用索赔，监理工程师应当（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":26},"批准相应的施工机械损坏和人员窝工费用",{"key":24,"text":298,"correct":26},"批准相应的分部分项工程费",{"key":28,"text":300,"correct":26},"批准相应的措施项目费",{"key":31,"text":302,"correct":22},"不予批准",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":28,"analysis":33},1107682,"根据《标准施工招标文件》的索赔条款，当发包人要求承包人提前竣工，承包人可以要求的补偿内容是（ ）。",[307,308,309,311],{"key":20,"text":284,"correct":26},{"key":24,"text":286,"correct":26},{"key":28,"text":310,"correct":22},"费用",{"key":31,"text":288,"correct":26},{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":31,"analysis":33},1107683,"承包商计算索赔费用常用的方法是（ ）。",[316,317,318,320],{"key":20,"text":77,"correct":26},{"key":24,"text":79,"correct":26},{"key":28,"text":319,"correct":26},"单价法",{"key":31,"text":75,"correct":22},{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},1107684,"计算索赔费用最常用的方法是（ ）。",[325,326,327,328],{"key":20,"text":77,"correct":26},{"key":24,"text":75,"correct":22},{"key":28,"text":79,"correct":26},{"key":31,"text":319,"correct":26},{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":28,"analysis":33},1107685,"采用修正的总费用法计算索赔费用时，计算公式为（ ）。",[333,335,337,339],{"key":20,"text":334,"correct":26},"索赔金额＝实际发生的直接费＋间接费＋利润",{"key":24,"text":336,"correct":26},"索赔金额＝实际总费用－投标报价估算总费用",{"key":28,"text":338,"correct":22},"索赔金额＝某项工作调整后的实际总费用－该项工作调整后的报价费用",{"key":31,"text":340,"correct":26},"索赔金额＝分部分项工程费＋利润＋税金",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":31,"analysis":33},1107686,"由于工程师原因导致承包人自有的施工机械停工，一般应按（ ）计算索赔款额。",[345,347,349,351],{"key":20,"text":346,"correct":26},"台班实际租金",{"key":24,"text":348,"correct":26},"台班使用费",{"key":28,"text":350,"correct":26},"机械台班费",{"key":31,"text":352,"correct":22},"台班折旧费",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":20,"analysis":33},1107687,"由总承包单位或安装单位负责采购的设备，采购前应向（ ）提交设备采购方案，并按相关程序审查批准后方可实施。",[357,359,361,363],{"key":20,"text":358,"correct":22},"建设单位",{"key":24,"text":360,"correct":26},"设计单位",{"key":28,"text":362,"correct":26},"总承包单位或安装单位技术负责人",{"key":31,"text":364,"correct":26},"项目监理机构",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":28,"analysis":33},1107688,"2016年3月实际完成的某土方工程，按2015年3月签约时的价格计算的工程价款为2000万元，该工程的定值权重为0.2，各调值因子除人工费的价格指数增长了10%外均未发生变化，人工费占调值部分的50%。按调值公式法计算，该土方工程需调整的价格差额为（ ）万元。",[369,371,373,375],{"key":20,"text":370,"correct":26},"20",{"key":24,"text":372,"correct":26},"40",{"key":28,"text":374,"correct":22},"80",{"key":31,"text":376,"correct":26},"100",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":20,"analysis":33},1107689,"下列引起费用增加的事项中，属于现场签证范围的是（ ）。",[381,383,385,387],{"key":20,"text":382,"correct":22},"施工合同范围以外的零星工程",{"key":24,"text":384,"correct":26},"承包人原因导致的人工.设备窝工",{"key":28,"text":386,"correct":26},"纠正施工方案错误引起的费用",{"key":31,"text":388,"correct":26},"质量问题返工的工程量",{"id":390,"libraryId":5,"type":15,"typeLabel":16,"stem":391,"options":392,"answer":28,"analysis":33},1107690,"施工过程中，出现施工图纸变更导致项目特征与招标工程量清单项目特征描述不符时，综合单价的确定应以（ ）的项目特征为准。",[393,395,397,399],{"key":20,"text":394,"correct":26},"原设计图纸所示",{"key":24,"text":396,"correct":26},"清单描述",{"key":28,"text":398,"correct":22},"变更图纸所示",{"key":31,"text":400,"correct":26},"标准图集描述",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":20,"analysis":33},1107691,"某工程的A分项工程施工至6月底，经统计分析得到，计划工程量为300立方米，计划单价为200元\u002F立方米；实际工程量为350立方米，实际单价为190元\u002F立方米。则分项工程A的进度偏差是（ ）。",[405,407,409,411],{"key":20,"text":406,"correct":22},"提前10000元",{"key":24,"text":408,"correct":26},"延误10000元",{"key":28,"text":410,"correct":26},"提前13000元",{"key":31,"text":412,"correct":26},"延误13000元",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":20,"analysis":33},1107692,"进行投资偏差分析时，当CV为负值时表示（ ）。",[417,419,421,423],{"key":20,"text":418,"correct":22},"项目运行超出预算投资",{"key":24,"text":420,"correct":26},"项目运行节支",{"key":28,"text":422,"correct":26},"项目进度延误",{"key":31,"text":424,"correct":26},"项目进度提前",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":31,"analysis":33},1107693,"某工程施工至2013年12月底，经分析，已完工作预算投资为100万元；已完工作实际投资为115万元；计划工作预算投资为110万元。则该工程的进度偏差为（ ）。",[429,431,433,435],{"key":20,"text":430,"correct":26},"超前15万元",{"key":24,"text":432,"correct":26},"延误15万元",{"key":28,"text":434,"correct":26},"超前10万元",{"key":31,"text":436,"correct":22},"延误10万元",{"id":438,"libraryId":5,"type":15,"typeLabel":16,"stem":439,"options":440,"answer":20,"analysis":33},1107694,"某工程施工至10月底，经统计分析，已完工作实际投资为260万元，已完工程预算投资为240万元，计划工作预算投资为200万元，则该工程此时的进度偏差为（ ）万元。",[441,442,443,445],{"key":20,"text":372,"correct":22},{"key":24,"text":370,"correct":26},{"key":28,"text":444,"correct":26},"-20",{"key":31,"text":446,"correct":26},"-40",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":20,"analysis":33},1107695,"在投资偏差分析中，可把投资偏差表示为（ ）与已完工作实际投资的差异。",[451,453,455,457],{"key":20,"text":452,"correct":22},"已完工作预算投资",{"key":24,"text":454,"correct":26},"计划工作预算投资",{"key":28,"text":456,"correct":26},"未完工程计划投资",{"key":31,"text":458,"correct":26},"拟完工程计划投资",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":28,"analysis":33},1107696,"某项目计划工作预算投资为50万元，已完工作实际投资为65万元，已完工作预算投资60万元，则投资偏差为（ ）万元。",[463,465,467,469],{"key":20,"text":464,"correct":26},"15",{"key":24,"text":466,"correct":26},"5",{"key":28,"text":468,"correct":22},"－5",{"key":31,"text":470,"correct":26},"10",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":28,"analysis":33},1107697,"关于赢得值法及其应用的说法，正确的是（ ）。",[475,477,479,481],{"key":20,"text":476,"correct":26},"赢得值法有四个基本参数和三个评价指标",{"key":24,"text":478,"correct":26},"投资（进度）绩效指数反映的是绝对偏差",{"key":28,"text":480,"correct":22},"投资（进度）偏差仅适合对同一项目作偏差分析",{"key":31,"text":482,"correct":26},"进度偏差为正值，表示进度延误",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},1107698,"（ ）是在某一时间已经完成的工作，以批准认可的预算为标准计算的资金总额。",[487,488,489,491],{"key":20,"text":452,"correct":22},{"key":24,"text":454,"correct":26},{"key":28,"text":490,"correct":26},"已完工作实际投资",{"key":31,"text":492,"correct":26},"计划工作实际投资",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":31,"analysis":33},1107699,"下列关于预付款的说法正确的是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":26},"包工包料工程的支付比例不得高于签约合同价（扣除暂列金额）的10%",{"key":24,"text":500,"correct":26},"包工包料工程的支付比例不得低于签约合同价（扣除暂列金额）的30%",{"key":28,"text":502,"correct":26},"对重大工程项目，按月工程计划逐月预付",{"key":31,"text":504,"correct":22},"实行工程量清单计价的工程，实体性消耗和非实体性消耗部分应在合同中分别约定预付款比例（或金额）",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1107700,"发包人应在预付款扣完后的（ ）天内将预付款保函退还给承包人。",[509,510,511,512],{"key":20,"text":212,"correct":26},{"key":24,"text":214,"correct":22},{"key":28,"text":218,"correct":26},{"key":31,"text":513,"correct":26},"30",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1107701,"某住宅小区，承包合同总额为3000万，业主支付的预付款为合同总额的20%，主要材料及构件所占的比重为30%，则工程预付款的起扣点为（ ）万元。",[518,520,522,524],{"key":20,"text":519,"correct":26},"900",{"key":24,"text":521,"correct":22},"1000",{"key":28,"text":523,"correct":26},"2000",{"key":31,"text":525,"correct":26},"2100",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1107702,"发包人在招标工程量清单中给定暂估价的专业工程，依法必须招标的，应当由发承包双方依法组织招标选择专业分包人。其中，（ ）应由承包人作为招标人。",[530,532,534,536],{"key":20,"text":531,"correct":26},"不属于依法必须招标的材料.工程设备",{"key":24,"text":533,"correct":22},"承包人不参加投标的专业工程发包招标",{"key":28,"text":535,"correct":26},"承包人参加投标的专业工程发包招标",{"key":31,"text":537,"correct":26},"依法必须招标的材料.工程设备",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1107703,"按（ ）分解的资金使用计划，工程项目的投资主要分为建筑安装工程投资、设备及工器具购置投资及工程建设其他投资。",[542,544,546,548],{"key":20,"text":543,"correct":22},"投资构成",{"key":24,"text":545,"correct":26},"子项目",{"key":28,"text":547,"correct":26},"时间进度",{"key":31,"text":549,"correct":26},"专业工程",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":20,"analysis":33},1107704,"S形曲线控制资金使用情况时，所有工作都按照（ ）时间开始，对节约发包人的建设资金贷款利息是有利的。",[554,556,558,560],{"key":20,"text":555,"correct":22},"最迟开始",{"key":24,"text":557,"correct":26},"最早开始",{"key":28,"text":559,"correct":26},"最迟完成",{"key":31,"text":561,"correct":26},"最早完成",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":24,"analysis":33},1107705,"在时间-投资累计曲线（S形曲线）中，所有工作一般都是按照（ ）开始，对节约建设资金贷款利息是有利的。",[566,568,570,572],{"key":20,"text":567,"correct":26},"最早开始时间",{"key":24,"text":569,"correct":22},"最迟开始时间",{"key":28,"text":571,"correct":26},"最早结束时间",{"key":31,"text":573,"correct":26},"最迟结束时间",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},1107706,"（ ）终止后，承包人应按照合同约定向发包人提交最终结清支付申请。",[578,580,582,584],{"key":20,"text":579,"correct":22},"缺陷责任期",{"key":24,"text":581,"correct":26},"质量保修期",{"key":28,"text":583,"correct":26},"竣工验收之日",{"key":31,"text":585,"correct":26},"工程完工之日",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1107707,"因承包人原因造成工程的缺陷或损坏，承包人拒绝维修或未能在合理期限内修复缺陷或损坏，且经发包人书面催告后仍未修复的，发包人有权自行修复或委托第三方修复，所需费用由（ ）承担。",[590,591,592,594],{"key":20,"text":175,"correct":26},{"key":24,"text":173,"correct":22},{"key":28,"text":593,"correct":26},"责任人",{"key":31,"text":595,"correct":26},"分包人",[597,600,603,606,609,612],{"id":15,"name":598,"category":7,"favorite":599},"领导干部任职前廉政法规知识测试题",92,{"id":601,"name":602,"category":7,"favorite":15},595,"建筑结构与设备",{"id":604,"name":605,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":607,"name":608,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":610,"name":611,"category":7,"favorite":8},534,"BIM工程师",{"id":613,"name":611,"category":7,"favorite":8},535]