[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-783-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":589},{"id":5,"name":6,"category":7,"favorite":8},783,"目标控制（土木建筑）","建筑工程",0,1,50,2641,[13,33,45,57,69,81,93,105,117,129,141,153,165,177,186,198,210,222,234,246,256,268,280,292,302,314,324,336,348,356,364,374,382,394,403,411,423,435,446,458,470,481,493,505,517,529,541,553,565,577],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},1107180,"单选题","某基础工程由于“献礼”要求而缩短了工期，未搞清地质情况就仓促开工，致使回填土工程质量不合格，其应为（ ）所致。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","违背建设程序的原因",true,{"key":23,"text":24,"correct":25},"B","施工与管理不到位的原因",false,{"key":27,"text":28,"correct":25},"C","地质勘察失真的原因",{"key":30,"text":31,"correct":25},"D","片面追求进度的原因","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":30,"analysis":32},1107181,"发生工程质量缺陷后，施工单位按监理机构审查合格的处理方案实施处理，监理机构对处理过程进行（ ），对处理结果进行验收。",[37,39,41,43],{"key":19,"text":38,"correct":25},"旁站监理",{"key":23,"text":40,"correct":25},"巡视检查",{"key":27,"text":42,"correct":25},"平行检验",{"key":30,"text":44,"correct":21},"跟踪检查",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},1107182,"发生工程质量缺陷后，要分析引起的原因，分析的基本步骤包括：①找出可能产生质量缺陷的所有因素；②进行细致的现场调查研究，了解引发缺陷的现象和特征；③收集调查与质量缺陷有关的全部设计和施工资料，分析所处各种条件和情况；④分析、比较和判断，找出最可能造成质量缺陷的原因；⑤进行必要的计算分析或模拟试验予以论证确认。正确的排序为（ ）。",[49,51,53,55],{"key":19,"text":50,"correct":21},"②③①④⑤",{"key":23,"text":52,"correct":25},"①②③④⑤",{"key":27,"text":54,"correct":25},"②①③④⑤",{"key":30,"text":56,"correct":25},"③②①⑤④",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":19,"analysis":32},1107183,"质量缺陷处理完毕后，（ ）应根据施工单位报送的监理通知回复单对质量缺陷处理情况进行复查，并提出复查意见。",[61,63,65,67],{"key":19,"text":62,"correct":21},"监理机构",{"key":23,"text":64,"correct":25},"建设单位",{"key":27,"text":66,"correct":25},"设计单位",{"key":30,"text":68,"correct":25},"质量监督机构",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":19,"analysis":32},1107184,"施工过程中，若出现质量缺陷，监理机构应及时（ ）。",[73,75,77,79],{"key":19,"text":74,"correct":21},"签发监理通知单",{"key":23,"text":76,"correct":25},"签发工程暂停令",{"key":27,"text":78,"correct":25},"通知建设单位",{"key":30,"text":80,"correct":25},"报告政府主管部门",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":27,"analysis":32},1107185,"对于某些工程质量缺陷，可能涉及的技术领域比较广泛，或问题很复杂，有时仅根据合同难以决策，这时可提请（ ）。",[85,87,89,91],{"key":19,"text":86,"correct":25},"试验验证",{"key":23,"text":88,"correct":25},"定期观测",{"key":27,"text":90,"correct":21},"专家论证",{"key":30,"text":92,"correct":25},"方案比较",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":19,"analysis":32},1107186,"工程质量事故的技术处理方案经相关各方签认后，项目监理机构应要求施工单位制定详细的（ ），监理机构对过程进行跟踪检查，对处理结果进行验收。",[97,99,101,103],{"key":19,"text":98,"correct":21},"施工方案",{"key":23,"text":100,"correct":25},"安全措施",{"key":27,"text":102,"correct":25},"质量措施",{"key":30,"text":104,"correct":25},"施工组织设计",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":19,"analysis":32},1107187,"工程质量事故处理方案的确定，需要按照一般处理原则和基本要求进行，其一般处理原则是（ ）。",[109,111,113,115],{"key":19,"text":110,"correct":21},"正确确定事故性质、处理范围",{"key":23,"text":112,"correct":25},"安全可靠、不留隐患",{"key":27,"text":114,"correct":25},"满足建筑物的功能和使用要求",{"key":30,"text":116,"correct":25},"技术上可行、经济上合理",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":19,"analysis":32},1107189,"质量事故发生后，（ ）就所发生的质量事故进行周密的调查、研究掌握情况，并在此基础上写出调查报告，提交监理机构和建设单位。",[121,123,125,127],{"key":19,"text":122,"correct":21},"施工单位",{"key":23,"text":124,"correct":25},"监理单位应要求施工单位",{"key":27,"text":126,"correct":25},"监理员",{"key":30,"text":128,"correct":25},"事故调查小组",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":30,"analysis":32},1107190,"某桥梁工程桩基施工过程中，由于操作平台整体倒塌导致3人死亡，100人重伤，直接经济损失118万元，根据安全事故造成的后果，该事故属于（ ）。",[133,135,137,139],{"key":19,"text":134,"correct":25},"一般事故",{"key":23,"text":136,"correct":25},"重大事故",{"key":27,"text":138,"correct":25},"较大事故",{"key":30,"text":140,"correct":21},"特别重大事故",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":23,"analysis":32},1107191,"按国家现行规定，造成直接经济损失3600万元的工程质量事故，应定为（ ）事故。",[145,147,149,151],{"key":19,"text":146,"correct":25},"一般",{"key":23,"text":148,"correct":21},"较大",{"key":27,"text":150,"correct":25},"重大",{"key":30,"text":152,"correct":25},"特别重大",{"id":154,"libraryId":5,"type":9,"typeLabel":15,"stem":155,"options":156,"answer":27,"analysis":32},1107192,"根据工程质量事故造成的人员伤亡或直接经济损失，（ ）不属于特别重大质量事故的条件。",[157,159,161,163],{"key":19,"text":158,"correct":25},"造成30人以上死亡",{"key":23,"text":160,"correct":25},"造成100人以上的重伤",{"key":27,"text":162,"correct":21},"造成5000万元以上的直接经济损失",{"key":30,"text":164,"correct":25},"造成1亿元以上的直接经济损失",{"id":166,"libraryId":5,"type":9,"typeLabel":15,"stem":167,"options":168,"answer":30,"analysis":32},1107193,"某工程施工中，由于施工组织不善，发生了质量事故，质量事故的处理方案一般由（ ）提出，经（ ）同意签认，并报（ ）批准。",[169,171,173,175],{"key":19,"text":170,"correct":25},"施工单位，监理机构，建设单位",{"key":23,"text":172,"correct":25},"监理机构，原设计单位，建设单位",{"key":27,"text":174,"correct":25},"监理机构，建设单位，原设计单位",{"key":30,"text":176,"correct":21},"施工单位，原设计单位，建设单位",{"id":178,"libraryId":5,"type":9,"typeLabel":15,"stem":179,"options":180,"answer":23,"analysis":32},1107194,"在工程质量事故的处理程序中，对于涉及结构安全和加固处理等的重大技术处理方案，一般由（ ）提出。",[181,182,184,185],{"key":19,"text":122,"correct":25},{"key":23,"text":183,"correct":21},"原设计单位",{"key":27,"text":62,"correct":25},{"key":30,"text":64,"correct":25},{"id":187,"libraryId":5,"type":9,"typeLabel":15,"stem":188,"options":189,"answer":19,"analysis":32},1107195,"工程质量事故调查组处理质量事故时，项目监理机构的正确做法是（ ）。",[190,192,194,196],{"key":19,"text":191,"correct":21},"积极配合，客观提供相应证据",{"key":23,"text":193,"correct":25},"积极配合，参与质量事故调查",{"key":27,"text":195,"correct":25},"积极配合，会同施工单位提供有利证据",{"key":30,"text":197,"correct":25},"回避质量事故调查",{"id":199,"libraryId":5,"type":9,"typeLabel":15,"stem":200,"options":201,"answer":19,"analysis":32},1107196,"在工程质量事故处理的依据中，施工单位需提供质量事故调查报告，在调查报告中首先（ ）。",[202,204,206,208],{"key":19,"text":203,"correct":21},"就与质量事故有关的实际情况做详尽的说明",{"key":23,"text":205,"correct":25},"提出质量事故处理方案",{"key":27,"text":207,"correct":25},"准确估计伤亡人数和直接经济损失",{"key":30,"text":209,"correct":25},"分析产生事故的原因",{"id":211,"libraryId":5,"type":9,"typeLabel":15,"stem":212,"options":213,"answer":27,"analysis":32},1107197,"施工质量验收时，抽样样本经实验室检测达不到规范及设计要求，但经检测单位的现场检测鉴定能够达到要求的，可（ ）处理。",[214,216,218,220],{"key":19,"text":215,"correct":25},"返工",{"key":23,"text":217,"correct":25},"补强",{"key":27,"text":219,"correct":21},"不做",{"key":30,"text":221,"correct":25},"延后",{"id":223,"libraryId":5,"type":9,"typeLabel":15,"stem":224,"options":225,"answer":27,"analysis":32},1107198,"工程建设过程中，下列造成工程质量缺陷的成因属于违背基本建设程序的是（ ）。",[226,228,230,232],{"key":19,"text":227,"correct":25},"无证设计",{"key":23,"text":229,"correct":25},"转包.挂靠",{"key":27,"text":231,"correct":21},"边设计.边施工",{"key":30,"text":233,"correct":25},"擅自修改设计",{"id":235,"libraryId":5,"type":9,"typeLabel":15,"stem":236,"options":237,"answer":19,"analysis":32},1107199,"下列造成质量缺陷的成因分析中，属于使用不当的是（ ）。",[238,240,242,244],{"key":19,"text":239,"correct":21},"任意拆除承重结构部件",{"key":23,"text":241,"correct":25},"技术交底不清，违章作业",{"key":27,"text":243,"correct":25},"施工方案考虑不周，施工顺利颠倒",{"key":30,"text":245,"correct":25},"疏于检查.验收",{"id":247,"libraryId":5,"type":9,"typeLabel":15,"stem":248,"options":249,"answer":27,"analysis":32},1107200,"质量缺陷成因分析的基本步骤包括：①收集调查与质量缺陷有关的全部设计和施工资料；②现场调查研究；③进行必要的计算分析或模拟试验予以论证确认；④分析、比较和判断，找出最可能造成质量缺陷的原因；⑤找出可能产生质量缺陷的所有因素。对上述步骤排序正确的是（ ）。",[250,251,252,254],{"key":19,"text":52,"correct":25},{"key":23,"text":54,"correct":25},{"key":27,"text":253,"correct":21},"②①⑤④③",{"key":30,"text":255,"correct":25},"①②⑤③④",{"id":257,"libraryId":5,"type":9,"typeLabel":15,"stem":258,"options":259,"answer":23,"analysis":32},1107201,"项目监理机构发现工程施工存在质量缺陷后，应发出（ ），要求施工单位进行处理。",[260,262,264,266],{"key":19,"text":261,"correct":25},"工程暂停令",{"key":23,"text":263,"correct":21},"监理通知单",{"key":27,"text":265,"correct":25},"工作联系单",{"key":30,"text":267,"correct":25},"监理报告",{"id":269,"libraryId":5,"type":9,"typeLabel":15,"stem":270,"options":271,"answer":27,"analysis":32},1107202,"质量缺陷处理完毕后，项目监理机构应根据施工单位报送的（ ）对质量缺陷处理情况进行复查，并提出复查意见。",[272,274,276,278],{"key":19,"text":273,"correct":25},"工程停工回复单",{"key":23,"text":275,"correct":25},"工程复工回复单",{"key":27,"text":277,"correct":21},"监理通知回复单",{"key":30,"text":279,"correct":25},"质量事故报告",{"id":281,"libraryId":5,"type":9,"typeLabel":15,"stem":282,"options":283,"answer":19,"analysis":32},1107203,"工程质量事故经技术处理后符合《建筑工程施工质量验收统一标准》规定的，经过检查或必要的鉴定后，（ ）应予以验收确认。",[284,286,288,290],{"key":19,"text":285,"correct":21},"监理工程师",{"key":23,"text":287,"correct":25},"事故调查组",{"key":27,"text":289,"correct":25},"业主项目负责人",{"key":30,"text":291,"correct":25},"质量监督工程师",{"id":293,"libraryId":5,"type":9,"typeLabel":15,"stem":294,"options":295,"answer":27,"analysis":32},1107204,"因施工原因发生工程质量事故，涉及结构安全处理的重大技术处理方案，**（ ）提出。",[296,297,299,300],{"key":19,"text":122,"correct":25},{"key":23,"text":298,"correct":25},"项目监理机构",{"key":27,"text":183,"correct":21},{"key":30,"text":301,"correct":25},"法定检测机构",{"id":303,"libraryId":5,"type":9,"typeLabel":15,"stem":304,"options":305,"answer":23,"analysis":32},1107205,"关于项目监理机构处理工程质量事故的说法，正确的是（ ）。",[306,308,310,312],{"key":19,"text":307,"correct":25},"签发监理通知单，要求施工单位及时处理",{"key":23,"text":309,"correct":21},"签发工程暂停令，暂停与其关联部位的施工",{"key":27,"text":311,"correct":25},"签发监理报告，向政府主管部门报告",{"key":30,"text":313,"correct":25},"签发工作联系单，要求施工单位及时处理",{"id":315,"libraryId":5,"type":9,"typeLabel":15,"stem":316,"options":317,"answer":19,"analysis":32},1107206,"为确保涉及结构使用安全质量事故的处理效果，需由项目监理机构组织进行的工作是（ ）。",[318,320,321,322],{"key":19,"text":319,"correct":21},"检验鉴定",{"key":23,"text":88,"correct":25},{"key":27,"text":90,"correct":25},{"key":30,"text":323,"correct":25},"定期评估",{"id":325,"libraryId":5,"type":9,"typeLabel":15,"stem":326,"options":327,"answer":27,"analysis":32},1107207,"项目监理机构应掌握工程质量事故所造成缺陷的处理依据、程序和（ ）。",[328,330,332,334],{"key":19,"text":329,"correct":25},"损失程度",{"key":23,"text":331,"correct":25},"影响范围",{"key":27,"text":333,"correct":21},"基本方法",{"key":30,"text":335,"correct":25},"等级",{"id":337,"libraryId":5,"type":9,"typeLabel":15,"stem":338,"options":339,"answer":23,"analysis":32},1107209,"根据工程质量事故造成的人员伤亡或者直接经济损失，工程质量事故分为（ ）个等级。",[340,342,344,346],{"key":19,"text":341,"correct":25},"3",{"key":23,"text":343,"correct":21},"4",{"key":27,"text":345,"correct":25},"5",{"key":30,"text":347,"correct":25},"6",{"id":349,"libraryId":5,"type":9,"typeLabel":15,"stem":350,"options":351,"answer":19,"analysis":32},1107210,"某桥梁工程桩基施工过程中，由于操作平台整体倒塌导致2人死亡，8人重伤，直接经济损失500万元，根据事故造成的后果，该事故属于（ ）。",[352,353,354,355],{"key":19,"text":134,"correct":21},{"key":23,"text":136,"correct":25},{"key":27,"text":138,"correct":25},{"key":30,"text":140,"correct":25},{"id":357,"libraryId":5,"type":9,"typeLabel":15,"stem":358,"options":359,"answer":27,"analysis":32},1107211,"工程施工过程中发生质量事故造成5人死亡、直接经济损失5000万元，该事故属于（ ）事故。",[360,361,362,363],{"key":19,"text":146,"correct":25},{"key":23,"text":148,"correct":25},{"key":27,"text":150,"correct":21},{"key":30,"text":152,"correct":25},{"id":365,"libraryId":5,"type":9,"typeLabel":15,"stem":366,"options":367,"answer":19,"analysis":32},1107212,"工期一定，质量事故处理完毕后，具备工程复工条件时，（ ）提出复工申请。",[368,369,371,372],{"key":19,"text":122,"correct":21},{"key":23,"text":370,"correct":25},"监理单位",{"key":27,"text":64,"correct":25},{"key":30,"text":373,"correct":25},"建设行政主管部门",{"id":375,"libraryId":5,"type":9,"typeLabel":15,"stem":376,"options":377,"answer":19,"analysis":32},1107213,"公路工程的沥青面层厚度误差超过了规范允许的范围，可采用弯沉试验，检查路面的整体强度，这种方法属于工程质量事故处理方案中的（ ）。",[378,379,380,381],{"key":19,"text":86,"correct":21},{"key":23,"text":88,"correct":25},{"key":27,"text":90,"correct":25},{"key":30,"text":92,"correct":25},{"id":383,"libraryId":5,"type":9,"typeLabel":15,"stem":384,"options":385,"answer":19,"analysis":32},1107214,"工程质量事故处理方案的类型有返工处理、不做处理和（ ）。",[386,388,390,392],{"key":19,"text":387,"correct":21},"修补处理",{"key":23,"text":389,"correct":25},"试验验证后处理",{"key":27,"text":391,"correct":25},"定期观察处理",{"key":30,"text":393,"correct":25},"专家论证后处理",{"id":395,"libraryId":5,"type":9,"typeLabel":15,"stem":396,"options":397,"answer":27,"analysis":32},1107215,"在质量事故处理中，对于出现的质量缺陷，经检测鉴定达不到设计要求，但经原设计单位核算，仍能满足结构安全和使用功能，可（ ）处理。",[398,399,400,401],{"key":19,"text":215,"correct":25},{"key":23,"text":217,"correct":25},{"key":27,"text":219,"correct":21},{"key":30,"text":402,"correct":25},"修补",{"id":404,"libraryId":5,"type":9,"typeLabel":15,"stem":405,"options":406,"answer":27,"analysis":32},1107216,"工程质量事故处理方案的确定，要以分析事故调查报告中事故原因为基础，结合实地勘查成果，并尽量满足（ ）的要求。",[407,408,409,410],{"key":19,"text":122,"correct":25},{"key":23,"text":370,"correct":25},{"key":27,"text":64,"correct":21},{"key":30,"text":68,"correct":25},{"id":412,"libraryId":5,"type":9,"typeLabel":15,"stem":413,"options":414,"answer":19,"analysis":32},1107217,"建设工程质量事故的等级是以（ ）为标准划分的。",[415,417,419,421],{"key":19,"text":416,"correct":21},"直接经济损失和人员伤亡数量",{"key":23,"text":418,"correct":25},"违法行为严重程度",{"key":27,"text":420,"correct":25},"工程项目的规模",{"key":30,"text":422,"correct":25},"永久质量缺陷对结构安全的影响程度",{"id":424,"libraryId":5,"type":9,"typeLabel":15,"stem":425,"options":426,"answer":30,"analysis":32},1107218,"在工程质量缺陷的处理程序中，项目监理机构签发监理通知单后的下一步程序是（ ）。",[427,429,431,433],{"key":19,"text":428,"correct":25},"施工单位按审查合格的处理方案实施处理，项目监理机构对处理过程进行跟踪检查",{"key":23,"text":430,"correct":25},"项目监理机构审查施工单位报送的质量缺陷处理方案，并签署意见",{"key":27,"text":432,"correct":25},"处理记录整理归挡",{"key":30,"text":434,"correct":21},"施工单位进行质量缺陷调查，分析质量缺陷产生的原因，并提出经设计等相关单位认可的处理方案",{"id":436,"libraryId":5,"type":9,"typeLabel":15,"stem":437,"options":438,"answer":30,"analysis":32},1107219,"下列质量缺陷的成因中，属于设计差错的是（ ）。",[439,440,442,444],{"key":19,"text":233,"correct":25},{"key":23,"text":441,"correct":25},"未搞清地质情况就仓促开工",{"key":27,"text":443,"correct":25},"地质勘察报告不详细",{"key":30,"text":445,"correct":21},"悬挑结构未进行抗倾覆验算",{"id":447,"libraryId":5,"type":9,"typeLabel":15,"stem":448,"options":449,"answer":30,"analysis":32},1107220,"在施工过程中，要分析究竟是哪种原因所引起的工程质量缺陷，必须对质量缺陷的（ ），以及其在施工中和使用中所处的实际情况和条件进行具体分析。",[450,452,454,456],{"key":19,"text":451,"correct":25},"本质原因",{"key":23,"text":453,"correct":25},"表现形式",{"key":27,"text":455,"correct":25},"严重程度",{"key":30,"text":457,"correct":21},"特征表现",{"id":459,"libraryId":5,"type":9,"typeLabel":15,"stem":460,"options":461,"answer":27,"analysis":32},1107221,"在工程质量缺陷的成因分析中，采用超常的低价中标属于（ ）。",[462,464,466,468],{"key":19,"text":463,"correct":25},"违背基本建设程序",{"key":23,"text":465,"correct":25},"施工与管理不到位",{"key":27,"text":467,"correct":21},"违反法律法规",{"key":30,"text":469,"correct":25},"盲目抢工",{"id":471,"libraryId":5,"type":9,"typeLabel":15,"stem":472,"options":473,"answer":19,"analysis":32},1107222,"质量缺陷的初始点能反映出质量缺陷的（ ），其在分析过程中具有关键性作用。",[474,476,478,479],{"key":19,"text":475,"correct":21},"直接原因",{"key":23,"text":477,"correct":25},"间接原因",{"key":27,"text":451,"correct":25},{"key":30,"text":480,"correct":25},"关键原因",{"id":482,"libraryId":5,"type":9,"typeLabel":15,"stem":483,"options":484,"answer":23,"analysis":32},1107223,"在进行质量缺陷成因分析中，首先要做的工作是（ ）。",[485,487,489,491],{"key":19,"text":486,"correct":25},"收集有关资料",{"key":23,"text":488,"correct":21},"现场调查研究",{"key":27,"text":490,"correct":25},"进行必要的计算",{"key":30,"text":492,"correct":25},"分析.比较可能的因素",{"id":494,"libraryId":5,"type":9,"typeLabel":15,"stem":495,"options":496,"answer":23,"analysis":32},1107224,"工程质量缺陷可分为施工过程中的质量缺陷和（ ）。",[497,499,501,503],{"key":19,"text":498,"correct":25},"可修复的质量缺陷",{"key":23,"text":500,"correct":21},"永久质量缺陷",{"key":27,"text":502,"correct":25},"可整改质量缺陷",{"key":30,"text":504,"correct":25},"不可整改质量缺陷",{"id":506,"libraryId":5,"type":9,"typeLabel":15,"stem":507,"options":508,"answer":27,"analysis":32},1107225,"关于监理单位质量方针的说法，正确的是（ ）。",[509,511,513,515],{"key":19,"text":510,"correct":25},"质量方针应由管理者代表制定",{"key":23,"text":512,"correct":25},"质量方针应由技术负责人制定",{"key":27,"text":514,"correct":21},"质量方针应由最高管理者发布",{"key":30,"text":516,"correct":25},"质量方针应由管理者代表发布",{"id":518,"libraryId":5,"type":9,"typeLabel":15,"stem":519,"options":520,"answer":27,"analysis":32},1107226,"质量管理应以人为本，体现的是（ ）的管理原则。",[521,523,525,527],{"key":19,"text":522,"correct":25},"以顾客为关注焦点",{"key":23,"text":524,"correct":25},"领导作用",{"key":27,"text":526,"correct":21},"全员参与",{"key":30,"text":528,"correct":25},"持续改进",{"id":530,"libraryId":5,"type":9,"typeLabel":15,"stem":531,"options":532,"answer":19,"analysis":32},1107227,"“持续改进”是质量管理体系7项质量管理原则之一，其核心是为了提高质量管理体系的（ ）。",[533,535,537,539],{"key":19,"text":534,"correct":21},"有效性和效率",{"key":23,"text":536,"correct":25},"科学性",{"key":27,"text":538,"correct":25},"管理水平",{"key":30,"text":540,"correct":25},"创造价值能力",{"id":542,"libraryId":5,"type":9,"typeLabel":15,"stem":543,"options":544,"answer":19,"analysis":32},1107228,"（ ）在质量手册和作业文件间起承上启下的作用。",[545,547,549,551],{"key":19,"text":546,"correct":21},"程序文件",{"key":23,"text":548,"correct":25},"质量计划",{"key":27,"text":550,"correct":25},"作业指导书",{"key":30,"text":552,"correct":25},"质量记录",{"id":554,"libraryId":5,"type":9,"typeLabel":15,"stem":555,"options":556,"answer":30,"analysis":32},1107229,"质量管理体系认可的对象是从事特定任务的团体或个人，不可以是（ ）。",[557,559,561,563],{"key":19,"text":558,"correct":25},"认证机构",{"key":23,"text":560,"correct":25},"认证人员",{"key":27,"text":562,"correct":25},"培训机构",{"key":30,"text":564,"correct":21},"培训人员",{"id":566,"libraryId":5,"type":9,"typeLabel":15,"stem":567,"options":568,"answer":23,"analysis":32},1107230,"内部审核是监理单位内部的质量保证活动，体系认证前，一般需要进行（ ）次内部审核。",[569,571,573,575],{"key":19,"text":570,"correct":25},"1-2",{"key":23,"text":572,"correct":21},"2-3",{"key":27,"text":574,"correct":25},"3-5",{"key":30,"text":576,"correct":25},"无要求",{"id":578,"libraryId":5,"type":9,"typeLabel":15,"stem":579,"options":580,"answer":19,"analysis":32},1107231,"监理单位质量管理体系内部审核时，正式运行阶段，重点在（ ）。",[581,583,585,587],{"key":19,"text":582,"correct":21},"符合性",{"key":23,"text":584,"correct":25},"适用性",{"key":27,"text":586,"correct":25},"系统性",{"key":30,"text":588,"correct":25},"可操作性",[590,593,596,599,602,605],{"id":9,"name":591,"category":7,"favorite":592},"领导干部任职前廉政法规知识测试题",92,{"id":594,"name":595,"category":7,"favorite":9},595,"建筑结构与设备",{"id":597,"name":598,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":600,"name":601,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":603,"name":604,"category":7,"favorite":8},534,"BIM工程师",{"id":606,"name":604,"category":7,"favorite":8},535]