[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110167":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1110167,783,1,"单选题","下列项目融资工作中，属于融资结构设计阶段工作内容的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","进行融资谈判",false,{"key":16,"text":17,"correct":18},"B","评价项目风险因素",true,{"key":20,"text":21,"correct":14},"C","选择项目融资方式",{"key":23,"text":24,"correct":14},"D","组织贷款银团","2020版教材P48-52",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]