[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110164":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110164,783,1,"单选题","根据项目融资程序，评价项目风险因素应在()阶段进行。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","投资决策分析",false,{"key":16,"text":17,"correct":14},"B","融资评判",{"key":19,"text":20,"correct":14},"C","融资决策分析",{"key":22,"text":23,"correct":24},"D","融资结构设计",true,"2020版教材P48-52",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]