[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1110056":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1110056,783,1,"单选题","为在建设期内利率、汇率或价格等因素的变化而预留的可能增加的费用指的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","未明确项目准备金",false,{"key":16,"text":17,"correct":14},"B","基本预备费",{"key":19,"text":20,"correct":14},"C","建筑安装工程间接费",{"key":22,"text":23,"correct":24},"D","涨价预备费",true,"2020版教材P35-36 涨价预备费是指为在建设期内利率、汇率或价格等因素的变化而预留的可能增加的费用，亦称为价格变动不可预见费。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]