[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109943":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1109943,783,1,"单选题","在国际工程项目建筑安装工程费构成中，分包费属于（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","直接费",false,{"key":16,"text":17,"correct":14},"B","间接费",{"key":19,"text":20,"correct":21},"C","工程总成本",true,{"key":23,"text":24,"correct":14},"D","总部管理费","2020版教材P26-27 分包费并列于直接费、间接费和公司总部管理费均属于工程总成本。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]