[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109918":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1109918,783,1,"单选题","根据世界银行对建设工程投资的规定，下列费用应计入项目间接建设成本的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","场地费用",false,{"key":16,"text":17,"correct":14},"B","仪器仪表费",{"key":19,"text":20,"correct":14},"C","不可预见准备金",{"key":22,"text":23,"correct":24},"D","开工试车费",true,"根据世界银行对建设工程投资的规定，下列费用应计入项目间接建设成本的是开工试车费。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]