[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109904":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1109904,783,1,"单选题","一项工程预计开支或实际开支的全部固定资产投资费用指的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","工程造价",true,{"key":16,"text":17,"correct":18},"B","建筑工程费",false,{"key":20,"text":21,"correct":18},"C","建设工程总投资",{"key":23,"text":24,"correct":18},"D","建筑安装工程费","2020版教材P1-2 工程造价是指一项工程预计开支或实际开支的全部固定资产投资费用。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]