[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109868":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1109868,783,1,"单选题","计算建设工程投资时，按（ ）顺序计算，并逐级汇总。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分项、分部、单位、单项工程",true,{"key":16,"text":17,"correct":18},"B","土建、安装设备工程流动资金",false,{"key":20,"text":21,"correct":18},"C","分部、分项、单项、单位工程",{"key":23,"text":24,"correct":18},"D","设备、土建、安装工程","2020版教材P3 本题考查的是建设工程投资的特点。确定层次繁多主要体现在由分项工程，到分部工程、单位工程、单项工程等的逐级汇总。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]