[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109851":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1109851,783,1,"单选题","建设工程设计方案选择和进行初步设计的投资控制目标是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","投资估算",true,{"key":16,"text":17,"correct":18},"B","设计概算",false,{"key":20,"text":21,"correct":18},"C","施工图预算",{"key":23,"text":24,"correct":18},"D","建安工程承包合同价","2020版教材P4 投资估算应是建设工程设计方案选择和进行初步设计的投资控制目标；设计概算应是进行技术设计和施工图设计的投资控制目标；施工图预算或建安工程承包合同价则应是施工阶段投资控制的目标。有机联系的各个阶段目标相互制约，相互补充，前者控制后者，后者补充前者，共同组成建设工程投资控制的目标系统。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]