[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109818":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1109818,783,1,"单选题","（2020年真题）建设项目设计概算文件采用三级概算或二级概算的区别，在于是否单独编制（ ）文件。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","分部工程概算",false,{"key":16,"text":17,"correct":14},"B","单位工程概算",{"key":19,"text":20,"correct":21},"C","单项工程综合概算",true,{"key":23,"text":24,"correct":14},"D","建设项目总概算","分项工程单位估价表是预算定额法编制施工图预算的重要依据，分项工程单位估价表中的单价包含完成相应分项工程所需的人工费、材料费和（??）。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]