[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109804":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1109804,783,1,"单选题","当初步设计的设备清单不完备，或安装预算单价及扩大综合单价不全，无法采用预算单价法和扩大单价法时，可采用（）编制概算?",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","扩大单价法",false,{"key":16,"text":17,"correct":14},"B","预算单价法",{"key":19,"text":20,"correct":21},"C","概算指标法",true,{"key":23,"text":24,"correct":14},"D","修正概算指标","2020版教材P113-115 当初步设计的设备清单不完备，或安装预算单价及扩大综合单价不全，无法采用预算单价法和扩大单价法时，可采用概算指标编制概算。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]