[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109789":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1109789,783,1,"单选题","三级预算编制形式的工程预算文件与二级工程预算文件相比，额外拥有的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总预算表",false,{"key":16,"text":17,"correct":18},"B","综合预算表",true,{"key":20,"text":21,"correct":14},"C","单位工程预算表",{"key":23,"text":24,"correct":14},"D","编制说明","2020教材P119-120 采用三级预算编制形式的工程预算文件包括：封面、签署页及日录、编制说明、总预算表、综合预算表、单位工程预算表、附件等内容。 采用二级预算编制形式的工程预算文件包括：封面、签署页及目录、编制说明、总预算表、单位工程预算表、附件等内容。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]