[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109717":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1109717,783,1,"单选题","（ ）计价方式以工程量清单和工程单价表为基础和依据来计算合同价格。较为合理地分担了合同履行中的风险。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","固定总价",false,{"key":16,"text":17,"correct":18},"B","估算工程量单价",true,{"key":20,"text":21,"correct":14},"C","纯单价",{"key":23,"text":24,"correct":14},"D","可调单价","2020版教材P146-151 估算工程量单价合同通常是由发包方提出工程量清单，列出分部分项工程量，由承包方以此为基础填报相应单价，累计计算后得出合同价格。但最后的工程结算价应按照实际完成的工程量来计算，即按合同中的分部分项工程单价和实际工程量，计算得出工程结算和支付的工程总价格。 这种合同计价方式较为合理地分担了合同履行过程中的风险。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]