[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109714":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1109714,783,1,"单选题","下列关于分部分项工程项目清单的描述，正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单为可以调整的开口清单",false,{"key":16,"text":17,"correct":14},"B","项目编码的第二级为附录分类顺序码，即三至五位",{"key":19,"text":20,"correct":14},"C","项目特征描述不可直接采用参见××图集的方式",{"key":22,"text":23,"correct":24},"D","计量单位的确定应结合拟建工程实际情况",true,"2020教材P130-133 选项A错误，分部分项工程量清单为不可以调整的闭口清单； 选项B错误，项目编码的第二级为附录分类顺序码，即三至四位： 选项C错误，对采用标准图集或施工图纸能够全部或部分满足项目特征描述要求的，项目特征描述可直接采用详见xx 图集或xx 图号的方式。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]