[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109708":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1109708,783,1,"单选题","下列关于招标文件中分部分项工程量清单的说法中，正确的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","清单为可调整的开口清单",false,{"key":16,"text":17,"correct":14},"B","投标人不必对清单项目逐一计价",{"key":19,"text":20,"correct":14},"C","投标人可以根据具体情况对清单的列项进行变更或增减",{"key":22,"text":23,"correct":24},"D","投标人不得对清单中内容不妥或遗漏的部分进行修改",true,"2020教材P129-130 分部分项工程项目清单为不可调整的闭口清单。在投标阶段，投标人对招标文件提供的分部分项工程项目清单必须逐一计价，对清单所列内容不允许进行任何更改变动。投标人如果认为清单内容有不妥或遗漏，只能通过质疑的方式由清单编制人作统一的修改更正。清单编制人应将修正后的工程量清单发往所有投标人。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]