[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109648":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1109648,783,1,"单选题","分部分项工程量清单项目设置五级编码。其中第五级编码为()顺序码。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","专业工程",false,{"key":16,"text":17,"correct":14},"B","分部工程",{"key":19,"text":20,"correct":14},"C","分项工程",{"key":22,"text":23,"correct":24},"D","工程量清单项目",true,"",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]