[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109632":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1109632,783,1,"单选题","（）是招标人根据国家或省级、行业建设主管部门颁发的有关计价依据和办法，以及拟定的招标文件和招标工程量清单，结合工程具体情况编制的招标工程的最高投标限价。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","招标控制价",true,{"key":16,"text":17,"correct":18},"B","项目预算价格",false,{"key":20,"text":21,"correct":18},"C","工程标底价格",{"key":23,"text":24,"correct":18},"D","中标价","2020教材P139-140 招标控制价是招标人根据国家或省级、行业建设主管部门颁发的有关计价依据和办法，以及拟定的招标文件和招标工程量清单，结合工程具体情况编制的招标工程的最高投标限价。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]