[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109589":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1109589,783,1,"单选题","施工过程中，工程量清单项目的增减变化必然带来合同价款的增减变化，下列不属于工程量清单缺项原因的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工条件改变",false,{"key":16,"text":17,"correct":18},"B","施工组织设计编写错误",true,{"key":20,"text":21,"correct":14},"C","工程量清单编制错误",{"key":23,"text":24,"correct":14},"D","设计变更","2020教材P164 施工过程中，工程量清单项目的增减变化必然带来合同价款的增减变化。而导致工程量清单缺项的原因，一是设计变更，二是施工条件改变，三是工程量清单编制错误。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]