[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109511":3},{"question":4,"library":22},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":21},1109511,783,1,"单选题","根据《建设工程工程量清单计价规范》（GB 50500-2013），中标人投标报价浮动率的计算公式是（ ）。",[11,14,17,19],{"key":12,"text":12,"correct":13},"A",true,{"key":15,"text":15,"correct":16},"B",false,{"key":18,"text":18,"correct":16},"C",{"key":20,"text":20,"correct":16},"D","",{"id":6,"name":23,"category":24,"favorite":25},"目标控制（土木建筑）","建筑工程",0]