[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109462":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1109462,783,1,"单选题","某工程，基础底板的设计厚度为0.9m，但承包商按1.0m施工，多做的工程量在工程计量时应( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计量一半",false,{"key":16,"text":17,"correct":18},"B","不予计量",true,{"key":20,"text":21,"correct":14},"C","按实际发生数计量",{"key":23,"text":24,"correct":14},"D","由业主和承包商协商处理","2020教材P160 对于不符合合同文件要求的工程，承包人超出施工图纸范围或因承包人原因造成返工的工程量，不予计量。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]