[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109453":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1109453,783,1,"单选题","（2020年真题）工程建设的不同阶段，对工程项目质量的形成有不同的影响，其中直接影响项目决策质量和设计质量的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","初步设计",false,{"key":16,"text":17,"correct":18},"B","项目可行性研究",true,{"key":20,"text":21,"correct":14},"C","施工图设计",{"key":23,"text":24,"correct":14},"D","方案设计","P2-3 项目的可行性研究直接影响项目的决策质量和设计质量。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]