[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109403":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1109403,783,1,"单选题","工程项目建设的各阶段对工程项目最终质量的形成都产生重要影响，其中项目决策阶段是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","确定项目质量目标与水平的依据",false,{"key":16,"text":17,"correct":18},"B","确定项目质量目标与水平",true,{"key":20,"text":21,"correct":14},"C","将项目质量与水平具体化",{"key":23,"text":24,"correct":14},"D","确定项目质量目标与水平达到的程度","2020版教材P2 本题考查的是工程质量形成过程与影响因素。项目决策阶段是通过项目可行性研究和项目评估，对项目的建设方案做出决策，使项目的建设充分反映业主的意愿。因此，项目决策阶段对工程质量的影响主要是确定工程项目应达到的质量目标和水平。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]