[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109401":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1109401,783,1,"单选题","（ ）是通过项目可行性研究和项目评估，对项目的建设方案做出决策，使项目建设充分反映业主对质量的要求和意愿。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程设计阶段",false,{"key":16,"text":17,"correct":14},"B","工程施工阶段",{"key":19,"text":20,"correct":21},"C","项目决策阶段",true,{"key":23,"text":24,"correct":14},"D","项目可行性研究阶段","2020版教材P2 本题考查的是工程质量形成过程与影响因素。项目决策阶段是通过项目可行性研究和项目评估，对项目的建设方案做出决策，使项目的建设充分反映业主的意愿。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]