[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109384":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1109384,783,1,"单选题","涉及建筑承重结构变动的装修工程设计方案，应经（ ）审批后方可实施。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":14},"B","监理单位",{"key":19,"text":20,"correct":14},"C","设计单位",{"key":22,"text":23,"correct":24},"D","原施工图审查机构",true,"涉及建筑主体和承重结构变动的装修工程，建设单位应在施工前委托原设计单位或者相应资质等级的设计单位提出设计方案，经原审查机构审批后方可施工。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]