[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109318":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1109318,783,1,"单选题","（2020年真题）根据《城市轨道交通建设工程验收管理暂行办法》，城市轨道交通建设工程所包含的单位工程验收合格且通过相关专项验收后，方可组织项目工程验收，项目工程验收合格后，建设单位应组织（ ）个月的不载客试运行。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":21},"C","3",true,{"key":23,"text":24,"correct":14},"D","6","P182-183 城市轨道交通建设工程所包含的单位工程验收合格且通过相关专项验收后，方可组织项目工程验收；项目工程验收合格后，建设单位应组织不载客试运行，试运行三个月、并通过全部专项验收后，方可组织竣工验收；竣工验收合格后，城市轨道交通建设工程方可履行相关试运营手续。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]