[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109209":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1109209,783,1,"单选题","对工程地质条件复杂或有特殊施工要求的重要工程，除一般勘察外，还应进行（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","选址勘察",false,{"key":16,"text":17,"correct":14},"B","初步勘察",{"key":19,"text":20,"correct":21},"C","施工勘察",true,{"key":23,"text":24,"correct":14},"D","详细勘察","2020版教材P95 工程勘察工作一般分三个阶段，即可行性研究勘察、初步勘察、详细勘察。对工程地质条件复杂或有特殊施工要求的重要工程，还应进行预可行性及施工勘察；对于地质条件简单、建筑物占地面积不大的场地，或有建设经验的地区，也可适当简化勘察阶段。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]