[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109186":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1109186,783,1,"单选题","（2019年真题）根据《建设工程监理规范》GB\u002FT 50319—2013，下列施工控制测量成果及保护措施中，项目监理机构复核的内容不包括（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工单位测量人员的资格证书",false,{"key":16,"text":17,"correct":14},"B","施工平面控制网的测量成果",{"key":19,"text":20,"correct":21},"C","测量设备的养护记录",true,{"key":23,"text":24,"correct":14},"D","控制桩的保护措施","施工控制测量成果及保护措施的检查、复核，包括： ①施工单位测量人员的资格证书及测量设备检定证书；②施 工平面控制网、高程控制网和临时水准点的测量成果及控制桩的保护措施。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]