[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109144":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1109144,783,1,"单选题","PC构件吊装前，项目（ ）应对吊装准备工作进行检查，并形成书面记录。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","监理员",false,{"key":16,"text":17,"correct":18},"B","专业监理工程师",true,{"key":20,"text":21,"correct":14},"C","总监理工程师",{"key":23,"text":24,"correct":14},"D","生产质检员","2020版教材P135-137 构件吊装前，项目专业监理工程师应对吊装准备工作进行检查，并形成书面记录。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]