[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109015":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1109015,783,1,"单选题","（2017年真题）向生产厂家订购设备质量控制工作的首要环节是对（ ）进行评审。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","质量合格标准",false,{"key":16,"text":17,"correct":14},"B","运输方式选择",{"key":19,"text":20,"correct":21},"C","合格供货厂商",true,{"key":23,"text":24,"correct":14},"D","工艺方案合理性","本题考核的是向生产厂家订购设备质量控制。选择一个合格的供货厂商，是向生产厂家订购设备质量控制工作的 首要环节。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]