[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1109001":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1109001,783,1,"单选题","市场采购的设备，若由建设单位直接采购，项目监理机构应协助建设单位编制设备采购方案，设备采购方案经（）的批准后方可实施",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","总监理工程师",false,{"key":16,"text":17,"correct":18},"B","建设单位",true,{"key":20,"text":21,"correct":14},"C","质监站",{"key":23,"text":24,"correct":14},"D","建设单位工程主管部门","2020版教材P197-198 设备由建设单位直接采购的，项目监理机构应协助建设单位编制设备采购方案；由总承包单位或设备安装单位采购的，项目监理机构应对总承包单位或设备安装单位编制的采购方案进行审查。设备采购方案经建设单位的批准后方可实施。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]