[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1108798":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1108798,783,1,"单选题","在进行质量管理体系的内部审核中，在正式运行阶段，重点审核（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","适用性",false,{"key":16,"text":17,"correct":14},"B","统一性",{"key":19,"text":20,"correct":21},"C","符合性",true,{"key":23,"text":24,"correct":14},"D","原则性","2020版教材P26-42 在进行内部审核时应注意：①在试运行阶段，审核体系的符合性和适用性；在正式运行阶段，重点则在符合性；②在试运行中要对所有要素审核一遍。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]