[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1108717":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1108717,783,1,"单选题","下列关于质量缺陷及其成因划分的说法中，正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","无图施工属于违反法律法规",false,{"key":16,"text":17,"correct":14},"B","无证设计属于违背基本建设程序",{"key":19,"text":20,"correct":21},"C","盲目套用图纸属于设计差错",true,{"key":23,"text":24,"correct":14},"D","施工组织管理紊乱属于操作工人素质差","考点:工程质量缺陷的成因。设计差错包括盲目套用图纸，采用不正确的结构方案，计算简图与实际受力情况不符，荷载取值过小，内力分析有误，沉降缝或变形缝设置不当，悬挑结构未进行抗倾覆验算，以及计算错误等。选项A错误，无图施工属于违背基本建设程序；选项B错误，无证设计属于违法法律法规；选项D错误，施工组织管理紊乱属于施工与管理不到位。参见教材P187。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]