[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1108640":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1108640,783,1,"单选题","双代号网络计划中，当计划工期等于计算工期时，以关键节点为完成节点的工作的特点是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","自由时差必然为零",false,{"key":16,"text":17,"correct":14},"B","总时差必然大于自由时差",{"key":19,"text":20,"correct":14},"C","总时差必然为零",{"key":22,"text":23,"correct":24},"D","总时差和自由时差必然相等",true,"考点:双代号网络计划时间参数的计算。在双代号网络计划中，当计划工期等于计算工期时，以关键节点为完成节点的工作，其总时差和自由时差必然相等。参见教材P54。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]