[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1108603":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1108603,783,1,"单选题","A工作后有紧后工作 B、 C，它们的持续时间分别为5d、4d和6d；BC工作最迟完成时间分别为25d和23d，则A工作的最迟开始时间为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","4d",false,{"key":16,"text":17,"correct":14},"B","8d",{"key":19,"text":20,"correct":21},"C","12d",true,{"key":23,"text":24,"correct":14},"D","16d","考点:双代号网络计划时间参数的计算。A工作的最迟开始时间等于其紧后工作最迟开始时间的最小值减去自身的持续时间=min{25-4，23-6}-5=12（天）。参见教材P48",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]