[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1108410":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1108410,783,1,"单选题","影响工程进度的因素中，施工安全措施不当属于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","业主因素",false,{"key":16,"text":17,"correct":18},"B","施工技术因素",true,{"key":20,"text":21,"correct":14},"C","组织管理因素",{"key":23,"text":24,"correct":14},"D","社会环境因素","考点:影响进度的因素分析。施工安全措施不当属于施工技术因素。参见教材P2",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]