[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1108343":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1108343,783,1,"单选题","建设工程施工进度控制工作流程图中，最后一项工作是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","监督工程保修",true,{"key":16,"text":17,"correct":18},"B","颁发移交证书",false,{"key":20,"text":21,"correct":18},"C","工程竣工验收",{"key":23,"text":24,"correct":18},"D","采取赶工措施","考点:建设工程施工进度控制工作流程。建设工程施工进度控制工作流程图中最后一项工作是监督工程保修。参见教材P119",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]