[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1108302":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1108302,783,1,"单选题","在工程设计过程中，影响进度的主要因素之一是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","复杂的工程地质条件",false,{"key":16,"text":17,"correct":14},"B","设计合同的计价方式",{"key":19,"text":20,"correct":14},"C","施工承发包模式的选择",{"key":22,"text":23,"correct":24},"D","设计各专业之间协调配合的影响",true,"考点:影响设计进度的因素。影响设计进度的因素主要有：（1）建设意图及要求改变的影响；（2）设计审批时间的影响；（3）设计各专业之间协调配合的影响；（4）工程变更的影响；（5）材料代用、设备选用失误的影响。参见教材P113。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]