[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107931":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1107931,783,1,"单选题","进行技术设计和施工图设计的投资控制目标是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工图预算",false,{"key":16,"text":17,"correct":14},"B","修正总概算",{"key":19,"text":20,"correct":21},"C","设计概算",true,{"key":23,"text":24,"correct":14},"D","投资估算","考点:投资控制的目标。设计概算应是进行技术设计和施工图设计的投资控制目标。参见教材P4。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]