[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107924":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1107924,783,1,"单选题","下列项目监理机构施工阶段投资控制的措施中，属于技术措施的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","继续寻找通过设计挖潜节约投资的可能性",true,{"key":16,"text":17,"correct":18},"B","复核工程付款账单，签发付款证书",false,{"key":20,"text":21,"correct":18},"C","对工程施工过程中的投资支出做好分析与预测",{"key":23,"text":24,"correct":18},"D","在项目监理机构中落实从投资控制角度进行施工跟踪的人员.任务分工和职能分工","考点:投资控制的措施。选项B、C属于经济措施；选项D属于组织措施。参见教材P6。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]