[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107923":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1107923,783,1,"单选题","下列施工阶段投资控制措施中，属于项目监理机构采取的组织措施的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","对工程项目造价目标进行风险分析，并制定防范性对策",false,{"key":16,"text":17,"correct":18},"B","编制详细的工作流程图",true,{"key":20,"text":21,"correct":14},"C","对设计变更进行技术经济比较",{"key":23,"text":24,"correct":14},"D","经常或定期向建设单位提交项目投资控制及其存在问题的报告","考点:投资控制的措施。选项A、D属于经济措施；选项C属于技术措施。参见教材P6。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]