[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107890":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1107890,783,1,"单选题","固定资产投资包括（ ）两部分。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设投资和无形资产",false,{"key":16,"text":17,"correct":14},"B","建设投资和铺底流动资金",{"key":19,"text":20,"correct":21},"C","静态投资和动态投资",true,{"key":23,"text":24,"correct":14},"D","固定资产投资和无形资产投资","考点:建设工程项目投资的概念。固定资产投资包括静态投资和动态投资。参见教材P1。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]