[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107802":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1107802,783,1,"单选题","采用“最高限额成本加固定最大酬金合同”方式，若承包方要获得成本、酬金的支付以及分享节约额则必须是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","实际成本在预期成本和报价成本之间",false,{"key":16,"text":17,"correct":14},"B","实际工程成本在报价成本和限额成本之间",{"key":19,"text":20,"correct":14},"C","实际工程成本超过限额成本",{"key":22,"text":23,"correct":24},"D","实际成本低于预期成本",true,"考点:合同计价方式。承包方要获得成本、酬金的支付以及分享节约额，是在实际成本低于预期成本的情况下。参见教材P150。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]