[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107795":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1107795,783,1,"单选题","根据现行规定，某分部分项工程的清单工程量为20000m3，施工方案工程量为30000m3。若该分部分项工程费中人材机费为100万元，措施项目费为7万元，规费为5万元，企业管理费为6万元，利润为8万元，税金为6万元，则该分部分项工程投标报价的综合单价为（ ）元\u002Fm3。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","38",false,{"key":16,"text":17,"correct":14},"B","44",{"key":19,"text":20,"correct":21},"C","57",true,{"key":23,"text":24,"correct":14},"D","66","考点:投标报价审核方法。根据《计价规范》，综合单价基于施工方案，应包括工料机三费、企业管理费和利润，并按清单工程量（并非施工方案工程量）计算与分摊。因此，该分部分项工程的综合单价＝（1000000＋60000＋80000）\u002F20000＝57（元\u002Fm3）。值得注意的是利润的计算，通常以单位工程量的“三费”与企业管理费之和为基数。参见教材P145。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]