[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107784":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1107784,783,1,"单选题","根据成本加酬金合同中的成本加奖罚合同的规定，当（ ）情况下，承包人才可获得实际发生的工程成本，获得酬金和奖金。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","实际成本＝预期成本",false,{"key":16,"text":17,"correct":18},"B","实际成本＜预期成本",true,{"key":20,"text":21,"correct":14},"C","实际成本＞预期成本",{"key":23,"text":24,"correct":14},"D","实际成本＜限额成本","考点:合同计价方式。当实际成本＜预期成本时，承包商得到实际发生的工程成本，获得酬金，并根据成本节约额的多少，得到预先约定的奖金。参见教材P150。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]