[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107753":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1107753,783,1,"单选题","（ ）合同以工程量清单和相应的综合单价表为基础和依据来计算合同价格，较为合理地分担了合同履行过程中的风险。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","固定总价",false,{"key":16,"text":17,"correct":18},"B","估算工程量单价",true,{"key":20,"text":21,"correct":14},"C","纯单价",{"key":23,"text":24,"correct":14},"D","可调单价","考点:合同计价方式。估算工程量单价合同以工程量清单和相应的综合单价表为基础和依据来计算合同价格，较为合理地分担了合同履行过程中的风险。参见教材P147。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]