[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107751":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1107751,783,1,"单选题","如果施工中出现施工索赔与现场签证，通常由承包人在索赔事件发生后的（ ）天内提出索赔金额。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","7",false,{"key":16,"text":17,"correct":14},"B","14",{"key":19,"text":20,"correct":21},"C","28",true,{"key":23,"text":24,"correct":14},"D","30","考点:合同价款约定内容。如果施工中出现施工索赔与现场签证，通常由承包人在索赔事件发生后的28天内提出索赔金额，发包人现场代表或授权的监理工程师在收到索赔报告后7天或10天以内对其进行核对。参见教材P152。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]