[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1107747":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1107747,783,1,"单选题","不能促使承包人降低工程成本，甚至最可能“鼓励”其增大工程成本的合同形式是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","成本加固定金额酬金合同",false,{"key":16,"text":17,"correct":18},"B","成本加固定百分比酬金合同",true,{"key":20,"text":21,"correct":14},"C","成本加奖罚合同",{"key":23,"text":24,"correct":14},"D","最高限额成本加固定最大酬金合同","考点:合同价款约定内容。在备选答案中，成本加固定百分比酬金合同，这种合同计价方式，工程总价及付给承包方的酬金随工程成本增加而增加，不利于鼓励承包方降低成本，故这种合同计价方式很少被采用。参见教材P150。",{"id":6,"name":27,"category":28,"favorite":29},"目标控制（土木建筑）","建筑工程",0]